Mobile
Log In Sign Up
Home > chinese-english > "偏位" in English

English translation for "偏位"

asymmetry
deflection
deflexion
deviation
dyssymmetry
off-normal
offsetting
unsymmetrical


Related Translations:
:  Ⅰ形容词1.(不正; 歪斜) inclined to one side; slanting; leaning 短语和例子东南偏东 southeast by east; 方向略偏 in a slight slanting direction; 这个指标偏低。 the target is on the low side. 这一枪打偏了。 that shot missed.2.(
Example Sentences:
1.Control measures for pile deviation in weak soil ground project
软弱土地基中工程桩偏位的控制
2.Treatment measure for broken concrete pile
预应力管桩偏位处理方案
3.Specification for internal drive , offset cruciform recess torq - set for rotary fastening devices - metric series
旋转式紧固装置的偏位十字形槽内驱动规范.公制系列
4.The purpose of the inertial trial is to determine the vessel stop distance and time at different main engine rate of revolution , and determine vessel leeway angle
惯性试验的目的是决定在各种主机转速下船舶的停止距离和时间,以及船舶的风压偏位角。
5.When installing steel tubular piles in regions where granite is shallowly overburdened , the piles are easy to deviate and the pile tip is easy to warp , resulting in slow driving
摘要在浅覆盖层花岗岩地区进行钢管桩施工,存在易偏位、桩尖易卷口和进度慢等技术难题。
6.The relatively short neck , scar contracture , and inactive movement of the involved side of the neck resulted in tracheal deviation , an unusual complication not appearing in previous reports
由于患者颈部较短,疤痕挛缩,同时缺少颈部之主动运动,因而导致少见的气管偏位,一项文献上未曾描述之并发症。
7.Piling deviation has always been crucial for quality control of pile foundation engineering of piled wharves . the causes of piling deviation is analyzed and feasible deviation - correcting measures are provided
摘要高桩梁板式码头桩基施工中,桩的偏位问题始终是桩基工程质量控制的重点。文章就沉桩的偏位原因进行多方面分析,并提出一些行之有效的施工过程中的纠偏措施。
8.The precise fe model was used to predict the factors of load - carrying capacity of the controlled sections of the box - girder , by selecting some important factors which can affect the load - carrying capacity , such as the area of cables , stiffness of expanding joints , elastic modulus of concrete , and the amount of living load , to simulate the several possible damages of the bridge in service in the future
( 3 )该桥在运营四年后,索力、挠度、应力与主塔偏位都在设计允许的范围内,大桥依然具备通行设计汽车荷载的能力。 ( 4 )对该桥承载力的预测分析表明:在所分析的可能损伤状态下,拉索具有足够的安全系数,损伤对控制截面的承载能力系数影响较大。
9.The tower shafts , most of which are hollow and varying in cross section , and altitudinal construction bring trouble to the form work and the stress of strand wire . and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints , elastic deformation , uneven settlement and temperature changes . the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction
但大跨度桥梁混凝土索塔施工设备进场及现场管理都比较困难;塔柱多为空心变截面,且为高空作业,给模板工程及预应力张拉带来一定困难;支撑系统连接的间隙变形、弹性变形、不均匀沉降以及环境温差可导致横梁裂缝;索塔施工偏位会引起的承台和基础的附加应力,对加劲梁的架设影响大;悬吊结构未完体系(架设时)施工阶段的风致振动往往影响到施工的安全和质量;实心塔柱部分体积较大,易产生温度裂缝。
10.Based on investigation and analysis , this paper found out the factors affecting deviation of marine piling , i . e . geological & geomorphological features , hydrometeorogical situation , vessel machines , underwater barriers , staff ' s sense of responsibility and experience , error of surveying and mapping instruments , as well as the passing vessels , etc
摘要通过调查分析,找出影响水上沉桩偏位的因素:地质地貌、水文气象、船机设备、水下障碍物、人员责任心和经验、测绘仪器的误差、过往船只,等等。
Similar Words:
"偏微分系数" English translation, "偏微分议程语言" English translation, "偏微商" English translation, "偏微商比值" English translation, "偏微与常微方程" English translation, "偏位, 离位, 断开位置" English translation, "偏位,支距" English translation, "偏位;迂回管" English translation, "偏位杯冠线虫" English translation, "偏位传感器" English translation