Mobile
Log In Sign Up
Home > chinese-english > "填石路堤" in English

English translation for "填石路堤"

rock-filled embankment

Related Translations:
路堤边坡:  bank slopefill slopeslope of embankment
填仓:  grain bin filling festival (the 25th day of the first lunar month)
填疮:  carbuncle replenishmentwound dressing
填墨:  opaquing stoppingopaquing,stopping
填权:  cumrightss
填图:  chart plottingchartingcompletion of drawingmap plottingmap spottingmapping
填铅:  leaded
填堤:  fill
填板门:  filler plate
超填:  extra fillextra-fill
Example Sentences:
1.The shear strength indexes of and c were obtained for these two embankments , and they demonstrated the reliability of thrust and sliding equilibrium method used to analyze the stability of embankment
在计算过程中提出4点基本假设,经过现场试验数据计算分析,论证了假设的成立和推滑平衡分析法应用于填石路堤的正确性,并通过比较得出灰岩作为材料使填石路堤边坡更为稳定的结论。
2.With the rapid development of the constructions in western china , the research on the design and building technology , the quality control and the evaluation parameters of high rock - filled embankment has been one of the key technologies in highway building in mountainous areas
随着我国西部建设的高速发展,高填石路堤的设计、施工技术及其质量控制方法和评价指标的研究已成为山区高等级公路面临的关键技术之一。
3.In this paper , first discussed are the corresponding results in highway and dam constructions and the engineering characters of rock - fills are deeply analyzed , especially the relationships between gradation , strength and maximum dry density , long - term stability of fillers including earth - fillers and rock - fillers and some conclusions of use are drawn . by in - situ tests and researches on compacting mechanism of high - filled rock embankments , effecting factors on compaction , construction technology and shock compacting technology , obtained in this paper are the compacting technology of high - filled rock embankment and the optimal parameters of rolling compaction . by deeply research on the theory and methods of quality control of high - filled embankment , settled are the questions as quality detection method and control standard of high - filled rock embankment
本文首先总结和分析了国内外公路和坝工行业已有的相关成果,深入探讨了填石料的工程性质与最大干密度、长期稳定性等之间的关系,得到了一些有益的结论;通过现场试验路堤的试验和对高填石路堤压实机理、填石路堤压实效果影响因素、施工工艺和冲击压实技术等研究,解决高填石路堤压实工艺和最优碾压参数控制等技术问题;通过深入研究填石路堤压实质量控制原理和方法,解决高填石路堤压实质量检测方法和控制标准技术难题;解决高填石路堤沉降观测技术问题,并根据沉降观测结果研究高填石路堤地基和路堤沉降变化规律,得到了能预测沉降变化规律的“龚帕斯”成长曲线预测模型;根据工程实际,深入研究了边坡稳定性的影响因素,得到了有益的结论。
4.By thoroughly analyzing the methods on slope stability of high rock - filled embankment , in this paper , a new kind of composite evolutionary algorithm is formed to search the critical slippage surface and also discussed in this paper is a new way to simplify the procedure of general slice method for stability analysis
本文还通过对目前国内外高路堤边坡稳定性分析方法的综合分析和深入探讨,简化了极限平衡法中的通用条分法的求解过程,并结合现代优化方法,提出一种新型的混合演化算法对高填石路堤边坡临界滑动面进行搜索。
5.During the research period , by combining theory analysis with engineering practice , the field tests in three sections with high rock - filled embankments , which are over 30m hig h , are put over . through the tests , plenty of valuable field data are obtained which will be helpful in the highway constructions in western china in the future
此外,本文结合理论分析与工程实践,成功地完成了三段高达30余米的高填石路堤的现场试验路,通过周密系统的分层沉降观测和分类现场检测,取得了丰富的现场资料,为今后西部高等级公路建设积累了宝贵的经验和数据。
6.In this paper , thoroughly discussed are construction technology and quality control of high - filled embankment based on the joint research project , research on construction technology and quality control of high - filled embankment , by guangxi highway management bureau and college of civil engineering , hunan university
本文以广西壮族自治区公路管理局和湖南大学土木工程学院联合承担的科研项目“高路堤施工技术与质量控制研究”为依托,深入研究了高填石路堤施工技术及质量控制技术。
7.The reference values of strength parameters of the grounds and rock - fillers of the high rock - filled embankment on liuzhai - shuien highway in guangxi are obtained in this paper by synthetically analyzing the construction technology at home and abroad and indoor rock tests . by comparing the analysis method of settlement laws and thoroughly analyzing the datum of the embankment settlements of liuzhai - shuiren highway from the whole cons truction period , a new method generated from expectation technology to analyze the embankment settlement laws , " compete " growth curve , is presented in this paper and the result tallies with the observation data . for there are shortcomings in indoor rock tests , in this paper by combining finite element method with duncan - chang nonlinear constitutive model and composite method , a method for back analysis of the strength parameters of rock fillers is presented with a corresponding program , which has been successfully applied
通过对国内外已有高填石路堤修筑资料的综合分析及室内岩石试验,获得了寨任二级公路高填石路堤地基及填料强度参数的参考值;通过对路堤沉降发展规律现有分析方法的比较及对广西寨任二级公路高填石路堤修筑工程中的沉降全过程观测资料深入分析,运用预测技术,提出了路基及路堤沉降发展规律分析的“龚帕斯”成长曲线分析方法;针对室内岩石试验的局限,运用有限元技术,结合邓肯一张非线性本构模型和复形调优法,提出了高填石路堤填石料强度参数的反演方法,开发了相应的反演分析程序,并成功地反演了广西寨任二级公路高路堤填石料的强度参数值。
8.With the rapid development of the constructions in mountain areas , high - fill embankments , especially high - rock filled ones will be widely applied . of all the questions during the construction of such embankments , such ones are needed first to be solved as finding economical construction ways and easy - to use quality control methods
随着山区高等级公路的迅速发展,高路堤特别是高填石路堤已成为我国山区高等级公路建设中无法回避的一种路堤结构形式,在高填石路堤修筑所面临的问题中,填石路堤的经济合理的施工技术、简便易行的质量控制方法等方面是急需解决的最关键的问题。
9.In this paper , thoroughly discussed are stability and settlement laws of high rock - filled embankment based on the joint research project , research on construction technology and quality control of high - filled embankment , by guangxi highway management bureau and college of civil engineering , hunan university
本文以广西壮族自治区公路管理局和湖南大学土木工程学院联合承担的科研项目“高路堤施工技术与质量控制研究”为依托,深入研究了高填石路堤稳定性及沉降规律。
Similar Words:
"填石灌浆" English translation, "填石护岸" English translation, "填石护坡" English translation, "填石基础" English translation, "填石块" English translation, "填石盲沟" English translation, "填石木垛" English translation, "填石木垛坝" English translation, "填石木框霸" English translation, "填石木笼" English translation