1 the project shall only be constructed at the location as indicated in figure 1 of the permit 与工程项目相关的建造工程,只准在图一显示的指定工地界线内进行。
2.
1 the project shall only be constructed at the location as indicated in figure 1 of this permit 与工程项目相关的建造工程,只准在图一显示的指定工地界线内进行。
3.
4 the dredging operation shall be at rate of no more than 40 m3 per hour within the designated site boundary 在指定工地界线内进行的挖泥作业,须以不超出每小时40立方米的速度进行。
4.
1 no construction work in relation to the project shall occur outside the designated site boundary as shown in drawing no . 1 与工程项目相关的建造工程,不得在图一显示的指定工地界线外进行。
5.
1 no construction work in relation to the project shall occur outside the designated site boundary as shown in drawing no . 1 与工程项目相关的建造工程,不得在第1号图则显示的指定工地界线外进行。