| 1. | Control engineering change with manufacturing department 监控制造过程的工程更改。 |
| 2. | Follow material ecn and reduce ecn obsolete cost 跟进材料工程更改通知,减少因工程更改而导致的报废。 |
| 3. | 3 evaluating parts cost change caused by ewo ( engineering working order ) . " 3审核工程更改造成的零件成本变化。 |
| 4. | Ecs engineering change schedule 工程更改日程表 |
| 5. | Ecp - engineering change proposal 工程更改建议 |
| 6. | Launch the ecr if it ' s necessary in new project development 9负责对公司所有批量生产前的项目必要时进行工程更改。 |
| 7. | Feedback the quality issue of assembly and test supplier , monitor the product / engineering change 反馈封装及测试厂质量问题,监督产品或工程更改。 |
| 8. | Be responsible for process on site and engineering change after sop . conduct continuously improvement on process 产品批产后,负责产品的现场工艺和工程更改,对产品工艺持续改进。 |
| 9. | Audit the change feasibility of current mfg process technique ; devote to improve the product quality continuously 致力于产品实物质量不断提高,审核现生产工程更改的工艺技术可行性。 |
| 10. | Any design change or engineering change of the contracted products will result in a di osal plan of the existing finished goods stock 供方或需方需要对本协议涉及的产品作设计或工程更改时,需协商处理已有的成品库存。 |