| 1. | Construction of piling works for bridge no . str06 于e区的桥编号str06进行打桩工程 |
| 2. | Technical memorandum on noise from percussive piling 管制撞击式打桩工程噪音技术备忘录 |
| 3. | Technical memorandum on noise from percussive piling , 管制撞击式打桩工程噪音技术备忘录 |
| 4. | This photograph shows piling work in progress 下图为进行中的打桩工程: |
| 5. | Continuation of construction of piling works for bridge no . str06 继续于e区的桥编号str06进行打桩工程 |
| 6. | Construction noise permits for the carrying out of percussive piling 进行撞击式打桩工程的建筑噪音许可证 |
| 7. | Piling works have been suspended 打桩工程已暂停进行。 |
| 8. | Construction of piled foundation 地基打桩工程 |
| 9. | Piling at the east abutment of bridge no . str18 near the wsd catchwater 邻近于长沙水务署集水区进行桥编号str18南桥墩的打桩工程 |
| 10. | Percussive piling from 7 am to 7 pm on any day other than a public holiday 在平日(不包括公众假期)上午七时至晚上七时进行撞击式打桩工程。 |