| 1. | Asymmetric construction of steel pipe concrete arch rib tied arch bridge 钢管混凝土拱肋系杆拱桥不对称施工 |
| 2. | Detection of arch rib concrete density of a concrete - filled steel pipe arch bridge 钢管混凝土拱桥拱肋混凝土密实性检测 |
| 3. | Construction of main arch ribs in half - through reinforced concrete tied arch bridge 中承式钢筋混凝土系杆拱桥主拱肋施工 |
| 4. | Scaffolding construction of concrete filled steel tube arch bridge with no wind - support system 无风撑钢管混凝土拱肋的支架施工 |
| 5. | Construction technique of back pouring of tie rod arch bridge arch rib steel pipe concrete 钢管混凝土系杆拱桥拱肋混凝土倒注施工技术 |
| 6. | Calculation of the temporary stays in the erection of steel tube arch ribs by suspender method 某钢管混凝土拱桥拱肋悬索吊装施工中的扣索计算 |
| 7. | Optimization of stayed - buckle cable forces during adjustment of the line - shape on long span arch bridge 大跨度拱桥拱肋线形调整中的扣索索力优化 |
| 8. | It is difficult or even tragedy of closure of span arch construction if cable control badly 若施工控制不好将对拱肋合龙造成困难,甚至导致事故的发生。 |
| 9. | The line shape control of the arch prefabricating and hoisting of long span arch bridge with concrete filled steel tube 大跨度钢管砼拱桥拱肋预制与吊装的线形控制 |
| 10. | Arch rib is the key point during the process of the long - span concrete - filled steel tube arch bridge construction 主拱肋施工是大跨度钢管混凝土拱桥施工的关键环节。 |