| 1. | The new measuring techniques for the existing railway 既有线测量新技术 |
| 2. | Construction method of bored concreting pile nearby existing railway line 既有线旁钻孔灌注桩施工方法 |
| 3. | Main problems and countermeasures to the existing railway for increasing speed 铁路既有线提速改造中的主要问题 |
| 4. | Construction method of the box - type structure jacking under the existing railway line 既有线下顶进箱涵的施工方法 |
| 5. | Research on reinforcement technique to enhance lateral stiffness of steel truss bridge on existing railway 既有线钢桁梁桥横向刚度加固技术 |
| 6. | Study on the linking - up of train working diagrams for the high - speed railway and the existing railway 高速线与既有线列车运行图衔接问题的研究 |
| 7. | For designing railway vehicle with lower noise , interior noise is measured in the cushioned berth sleeping car 为了设计低噪声铁道车辆,对我国既有线上的软席卧车(空调)进行了车内噪声测试。 |
| 8. | Along with the increasing in speed on the current line , it is more important of comfortable and safety in the passenger train 随着既有线提速,旅客列车的舒适性、安全性愈显重要,对桥梁结构的要求愈加严格。 |
| 9. | The major noise sources of low - speed railway vehicles ( v 200km / h ) running in domestic existing lines are wheel - rail rolling and structure noise 我国既有线铁路客车运行速度多在200km h以下,属于低速运行。运行噪声以轮轨噪声和构造物噪声为主。 |
| 10. | The features of the passenger flow , the transportation tasks and the service level of the inter - city railway all differ from those of the existing railway lines 摘要城际铁路的客流性质、承担的运输任务以及提供给旅客的服务水平都与铁路既有线有所不同。 |