Mobile
Log In Sign Up
Home > chinese-english > "项目计划管理" in English

English translation for "项目计划管理"

pprimavera project planner
Example Sentences:
1.General progam of network planning techniques used in project management
网络计划技术在项目计划管理中应用的一般程序
2.The changing actuality of the project management enterprises and the countermeasures for developing
网络计划技术在项目计划管理中的研究与应用
3.You can use the combination of microsoft project , the internet , or an intranet to powerfully communicate and manage your project plan
Microsoftproject与internet或intranet结合起来之后,可为您提供强大的项目计划管理和交流能力。
4.Based on analyzing the management status quo of the pre - research enterprises and combining characteristics of advanced technique demonstration projects , this paper conducts study on their main points and difficult points deeply . at present , in the process of implementation of such projects , researchers usually put emphasis on high technical performance , but have less consideration of the cost and time limit . hence , how to definite the appropriate project scope is studied ; aim at the problem of unscientific planning method in some enterprises , project planning management is studied ; aim at the problem of schedule control , project control method is studied
鉴于目前科研院所在实施先期技术演示验证项目的过程中,普遍追求高技术性能,较少强调经费、时间限制的状况,本文对如何确定合适的项目工作范围进行了研究;针对部分科研单位对计划重视不够,计划方法单一、不甚科学的状况,进行了项目计划管理研究;针对先期技术演示验证项目试验件加工进度控制难的问题,进行了项目进度控制研究;针对该类项目创新性强、风险因素多、技术风险较大的特点,进行了技术风险分析研究;针对当前该类项目科技成果评价难度大、随意性较大的现状,进行了项目科技成果评价研究。
5.By comparing the results of the living example , it analyzes the inconsequence of the old algorithm about the key line of the fiizzy network and verifies the rationality of the new method based on the new definition advanced . it offers a new means to calculate project time limit about indefinite item planning - management
通过实例计算结果比较,分析了以前模糊网络关键路线算法的不合理性,证实了本文提出的新的定义下模糊关键路线法的合理性,为非确定性项目计划管理提出了新的工期计算方法。
6.In order to solve these problems , three kinds of strategies are designed from the perspective of the management experience of other foreign and / or domestic projects and in combination with the project management status of the company : one is select project manager and make up a group , the other is to strengthen the planned management of the project , and the third is to enforce strictly supervision and control of the project
针对这些问题,本文借鉴国内外其它项目的管理经验并结合该公司项目管理实际,从三个方面提出了该公司项目管理对策:一是选择项目经理,组建项目团队;二是加强项目计划管理;三是严格项目实施监督与控制。
Similar Words:
"项目计划编制" English translation, "项目计划簿, 项目计划文卷" English translation, "项目计划的更新" English translation, "项目计划的有效性" English translation, "项目计划方法" English translation, "项目计划和控制" English translation, "项目计划技术" English translation, "项目计划开发" English translation, "项目计划设计图" English translation, "项目计划实施" English translation