| 1. | It has only 23 km to hangzhou bay cross - sea bridge 基地距杭州湾跨海大桥只有23公里。 |
| 2. | The construction technology of rider cap of hangzhou bay cross - sea bridge 标段承台施工中的应用 |
| 3. | Construction process quality control for hangzhou bay cross - sea bridge 杭州湾跨海大桥施工过程质量监理控制方法 |
| 4. | Recycling of extra grout in pile - bottom grouting construction of hangzhou bay cross - sea bridge 杭州湾跨海大桥承台施工技术 |
| 5. | Analysis of causes for tube blockage in bored pile construction of hangzhou bay cross - sea bridge 跨海大桥超长钻孔桩堵管原因分析 |
| 6. | Introduction to bridge - tunnel combination solution for quanzhou bay cross sea passage project 泉州湾跨海通道工程桥隧组合方案介绍 |
| 7. | The application of data collection system in the construction of hangzhou bay cross - sea bridge 施工数据采集系统在跨海大桥建设中的应用 |
| 8. | The design of the drilling platform for bored pile construction of hangzhou bay cross - sea bridge 杭州湾跨海大桥承台钢板桩围堰的设计与施工 |
| 9. | The application of gps - rtk in pile foundation construction survey of hangzhou bay cross - sea bridge 杭州湾跨海大桥桩底压浆水泥浆的回收利用 |
| 10. | Research on the construction technology of pressure grouting on the base of pile in hangzhou bay cross - sea bridge 杭州湾跨海大桥桩底压浆施工技术研究 |