| 1. | Technology of bored pile in bridge foundation construction in karst area 岩溶地区桥梁桩基施工措施 |
| 2. | Treatment method for accidents in the bridge foundation investigation drilling in karst terrain 岩溶地区桥基勘察钻探事故的处理方法 |
| 3. | Ultrasonic tomography technology and its applications in undamage test of bridge foundation piles 成像技术及其在大型桥梁基桩无损检测中的应用 |
| 4. | Study on safe thickness of rock mass at end of bridge foundation ' s pilein karst and worked - out mine area 岩溶及采空区桥梁桩基桩端岩层安全厚度研究 |
| 5. | The reason of blocking pipe while pouring the pile of bridge foundation is analyzed , and the dealing methods are expounded 对桥基础灌桩堵管进行了原因分析,论述了堵管事故的处理方法,阐明了灌桩堵管的具体对策。 |
| 6. | Application of underground grouted seep control curtain technique to water - repellent construction of soil and stone cofferdams for bridge foundations 地下锚固压浆防渗帷幕技术在桥梁基础土石围堰防水施工中的应用 |
| 7. | Abstract with the development of bridge construction in china , the bridge foundation safely monitor became a very important work 随着我国桥梁事业的飞速发展,大型桥梁地基基础的安全监测成为一项十分重要的工作。 |
| 8. | Abstract : the reason of blocking pipe while pouring the pile of bridge foundation is analyzed , and the dealing methods are expounded 文摘:对桥基础灌桩堵管进行了原因分析,论述了堵管事故的处理方法,阐明了灌桩堵管的具体对策。 |
| 9. | The spring elements are adopted to simulate the link between the bridge foundation and soil , and the longitudinal restraint of tracks on the superstructure of bridges 摘要采用弹簧单元模拟地基对桥梁基础的嵌固以及轨道桥面系对梁体的纵向约束作用,建立桥梁轨道桥面地基共同受力的全桥整体模型。 |
| 10. | This paper analyzes the influence of pile spacing , pile diameter and pier cross - section on the stiffness of bridge foundation through the calculation of the longitudinal stiffness at pier - top 摘要对桥墩纵向刚度进行计算,分析影响桥梁下部结构刚度的主要因素,包括桩径、桩间距以及墩截面几何尺寸。 |