| 1. | Analysis on the influence factors in the compaction test 影响土样击实试验结果的试验分析 |
| 2. | Data processing of geo - technical compaction test using computer 土工击实试验数据处理的计算机实现 |
| 3. | Reliability study on the compaction test results of xiaolangdi project 小浪底工程击实试验结果的可靠性研究 |
| 4. | Proctor compaction test 普氏压实试验 |
| 5. | In the paper , through the compaction test , the optimum moisture content and maximal dry density of aeolian sand are determined 本文通过击实试验,确定了风积沙的最佳含水量和最大干密度。 |
| 6. | Tests relating to pavements . compaction tests on non - bituminous materials . part 2 : compactibility using the gyratory testing machine 路面试验.不含沥青粘结剂材料的压实.第2部分:旋转剪切机压实试验 |
| 7. | It can serve as reference material for projects of similar nature , such as compaction test process , results , test equipment and technical methods etc 工程的碾压试验过程、结果,和试验设备的配置、工艺方法等,可为同类工程参考。 |
| 8. | At present , the maximum dry density , which is a very import parameter of the degree of compaction , is ascertained by standard indoor compaction test 目前,对于公路工程路基土施工质量压实度检测应用的最大干密度是通过室内标准击实试验来确定。 |
| 9. | Large - scale compaction tests have been carried out and compared with design compacted standards before embankment in order to ensure embankment parameter for dam construction 摘要盘石头水库面板堆石坝,在填筑前进行了大型碾压试验,复核设计压实标准,确定各区筑坝材料的填筑参数,供坝体施工采用。 |
| 10. | Generally , no less than one compaction test is needed for any earth sample . when the sample has a little change , it is necessary to carry out another test , which would have great influence on construction schedule 一般一种土样至少需要做一个击实试验,土样稍有变化又需另作,从而给检测、监理人员造成较大负担,往往对施工进度有较大影响。 |