| 1. | Charge and discharge operation test for battery and charge equipment 蓄电池和充电装置的充放电试验。 |
| 2. | Safety valve operation test 安全阀调整试验 |
| 3. | Emergency operation test of windlass / load / start / stop shall be carried out 进行锚机/负载/起动/停止/应急操作的运行试验。 |
| 4. | Abnormal operation test 非正常操作试验 |
| 5. | The operations test 作业验证法 |
| 6. | Operation test of all major equipment working for m . e . , run normally 、 eligibly 5服务于主机的各种设备进行了运行试验,运行正常、合格。 |
| 7. | Operation test of emergency switching - off device for oil pump and ventilator ( bilge pump ) in engine room 机舱风、油(舱底泵)应急切断装置操作试验。 |
| 8. | Connectors for electronic equipment - tests and measurements - mechanical operation tests - test 13e : polarizing and keying method 电子设备用连接器.试验和测量.机械操作试验.试验13e :偏振和关键方法 |
| 9. | Combining dynamic operation test , the influence of filamentous microbe on membrane fouling process was analyzed with tracing observation 摘要结合动态运行试验,针对丝状菌对膜污染过程的影响进行了跟踪观察和分析。 |
| 10. | Connectors for electronic equipment - tests and measurements - part 13 - 5 : mechanical operation tests - test 13e : polarizing and keying method iec 60512 - 13 - 5 : 2006 ; german version en 60512 - 13 - 5 : 2006 测量和控制数字数据通信工业控制系统用现场总线类型10 : profinet规范第2部分:应用层协议规范 |