| 1. | Study on the production planning and controlling methods based on jit 的生产计划与控制方法研究 |
| 2. | Production planning and control - vocabulary 生产计划和控制.词汇 |
| 3. | Production planning and control 生产计划与管制 |
| 4. | Finally , the paper establishes system frame of ve ' s production planning and control 最后,论文建立了虚拟企业生产计划与协调控制系统的框架体系。 |
| 5. | All the research is validated through the design , development and application of workshop production plan and control system of a certain wall paper factory in guangdong 以上研究指导了某墙纸厂的车间生产计划与控制系统的设计、开发和应用,并得到验证。 |
| 6. | In addition , this thesis conducts research on production plan and control , cost and quality control , warehousing and logistical control , information control 在关键控制领域范围内,分别从生产计划与控制、成本和质量控制、库存和物流控制以及信息控制等方面进行了研究。 |
| 7. | Secondly , this paper brings forward a production planning and control frame based on the above analysis of mrpii and toc , and analyzes its main characteristics 然后,通过以上对mrp和toc的分析,本文提出丁一种基于mrp和toc的集成计划与控制系统框架,并分析了该框架的特点。 |
| 8. | So , it is very important for the semi - process industry to establish effective production plan and control system so as to adapt to market requirement and to improve its competent ability 因此,建立合理有效的生产计划与控制系统对于半流程制造企业适应市场需要,以及提高其竞争能力具有重要的意义。 |
| 9. | In virtual enterprise , there are composite optimization problems for member chosing and production planning and control , which are very difficult to solve by using mathematical model 在虚拟企业环境下,对动态联盟成员的选择、生产计划和控制方案的制订等多种功能的需要,带来了一系列新的组合优化问题。 |
| 10. | In this thesis , on the basis of researching characteristic and emphasis of the production planning and control system of ve , the author study on the key enabled technology of virtual enterprise eynergic planning and control 论文在分析了虚拟企业生产计划与控制的特点、重点、难点的基础上,重点对虚拟企业协同计划与控制的关键使能技术进行了研究。 |