Mobile
Log In Sign Up
Home > chinese-english > "top plate" in English

English translation for "top plate"

导磁上板
钢板弹簧舌片
上滑板


Related Translations:
topping unit:  顶索定位装置切顶器
top draining:  地表排水
permanent top:  固定炉盖
recombed top:  复精梳毛条
top slat:  车顶铰接机构
right top:  右上部显示
top packer:  顶部打捆器
top loading:  顶部加压顶加载自顶装入
top boot:  长统马靴
top section:  顶部部分顶截面
Example Sentences:
1.Influence of geological conditions on occurrence of accidents related to top plate
地质条件对顶板事故的影响
2.Steel - cover galvanized top plate
全钢表面镀锌
3.The rising blocker cover top plate
端盖顶部
4.Available with stainless steel ms7625 or high - impact plastic ms7620 top plate
有ms7625不锈钢和ms7620抗冲击塑料两种类型可供选
5.It can increase the hole inclination angle range and drill elevation angle hole , while setting the top drive power head and hole top plate toward the opposite direction
4钻机动力头及孔口板调转方向,可钻凿仰孔。
6.It can increase the hole inclination angle range and drill elevation angle hole , while setting the top drive head and hole top plate toward the opposite direction
动力头及孔口板调转方向,可直接钻凿仰孔,大大增加钻孔倾角范围。
7.It can increase the hole inclination angle range and drill elevation angle holes , while setting the top drive power head and hole top plate toward the opposite direction
动力头及孔口板调转方向,可直接钻凿仰孔,大大增加钻孔倾角范围。
8.With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake , as well as for excavated field , in line with railway engineering anti - earthquake design specification , dynamic triaxial tests and theoretical analysis using efficient stress method , the author comes to the conclusion that , when metro plate is located at layer s and the layer is thick , liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate , or arch sides at the top of metro in most places
摘要采用铁路工程抗震设计规范、动三轴试验及有效应力的理论分析相结合的方法,对南京地铁南北线( 1号线)区间隧道开挖后其地基土在7度地震情况下的土层液化情况进行分析得出:当隧道底板坐落在5层且5层较厚时的液化区出现在隧道衬砌底板处;局部地段液化区出现在隧道顶部及拱腰;大部分地段的液化区出现在隧道顶板上方。
9.Abstract : in this paper , the efficient stress method is used as main means , while the railway engineering anti - earthquake design specification and the dynamic triaxial test are used as additional means . the authors analyze the ground layer liquefaction of shield tunnelling built on powder soil or fine sand , whose top plate is buried under two kinds of depth , and conclude that the liquefaction area is different with different buried depth . finally , the rational buried depth is proposed
文摘:以有效应力原理的有限元计算分析为主、铁路工程抗震设计规范及室内动三轴实验为辅,对修建在粉土或粉细砂层中的盾构隧道进行了两种不同埋深情况下的液化分析,得出了埋深不同液化区出现区域不同的结论,并提出隧道抗液化的合理埋深。
10.Fabrication of the box beam is divided into such parts as reinforcement , formwork , concreting , prestressing , moving and storing of beam , pipe grouting under pressure , end sealing of the beam , water - proof layer on the bridge surface system , protective coating etc . the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects , such technologies as : manufacturing and fixing of reinforcement , steel reinforcement fixing baseplate , web plate and top plate respectively and lifting the steel skeleton into form , requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork , optimization of concrete ratio , concrete pouring process of two ends of beam in priority over the middle , in sequence of first baseplate followed by web plate and top plate at last , concrete pouring in inclined section and in horizontal layer , concrete vibration mainly by external vibrator in assistance with internal vibrator , methods and regulation for steam curing of concrete , dual controls over stress and strain to ensure quality of prestressing workmanship , construction method of effective beam moving by heavy - weight special moving facility , some regulations and key notes about construction of grouting under pressure , beam ends sealing , water - proof layer on the bridge surface system , protective coating
箱梁制造由钢筋工程、模板工程、混凝土工程、预应力工程、移存梁工程、孔道压浆工程、梁体封端工程、桥面防水层和保护层工程等施工环节组成。文中介绍的采用胎具制作和绑扎钢筋,分底腹板和顶板分别绑扎并吊装钢筋骨架入模;拆装式和液压式两种模板的设计、制作要求和使用方法;综合考虑、优化混凝土配合比,混凝土灌注从两端至中间、先底板、后腹板、再顶板的施工顺序和斜向分段、腹板水平分层、附着式振捣为主、插入式捣固为辅的施工工艺,蒸汽养护的方法和规定;应力应变双控制确保预应力施工质量的施工技术;采用重物移运器有效移梁的施工方法;压浆、封端、桥面防水层和保护层施工的一些规定和注意事项等都是对箱梁制造行之有效的施工技术和施工方法,并可为以后类似施工作借鉴。
Similar Words:
"top ping paint" English translation, "top ping-out ceremony" English translation, "top pintle" English translation, "top piston ring" English translation, "top plane iron" English translation, "top plate heating element" English translation, "top plate screw" English translation, "top platform" English translation, "top plating" English translation, "top player" English translation