Mobile
Log In Sign Up
Home > chinese-english > "引水式水电站" in English

English translation for "引水式水电站"

diversion conduit type hydropower staion

Related Translations:
水电站设备:  equipment for hydroelectric station
引水阀:  diversion valve
引水上山:  draw water uphill diversion
引水锚地:  pilot anchorage
引水信号:  pilot signal
引水渠:  approach channelaqueductcha elofa roachchannel of approachderivation channeldiversion canaldiversion channelfeed ditchfeeder canalheadwater channelleatracewaywater-race
引水渗沟:  diversion blind drain
引水量:  abstraction volume
引水桥:  aqueduct
引水口:  diversion gapirrigating gate
Example Sentences:
1.Hydropower station with the pressure diversion system is one of the main arrangement type of hydropower station
压力引水式水电站,是水电站的主要布置型式之一。
2.Through the experimental research , the reasonable parameters of the surge chamber of the hydropower station are obtained
通过模型试验得到了该压力引水式水电站调压井的合理参数。
3.By using of experimental method this paper studies the unsteady flow of a hydropower station with the pressure diversion system .
本文采用模型试验法,对一压力引水式水电站引水系统的非恒定流问题进行研究。
4.Because of the changes of load on the power units in hydropower station , the flow in the pressure diversion system would change rapidly
压力引水式水电站在运行时,由于负荷变化,引水系统常出现非恒定流现象。
5.For the operation of the diversion - type hydropower station after extension , the main problem comes from the safe and stable operations of both the extended generating units and the original ones and the hydraulic influence of their interaction therein
在扩建增容的引水式水电站运行中,其增容机组和原设机组运行的安全稳定性以及相互的水力影响是其中的主要问题。
6.Based on a algorithm integrated by the method of characteristics for the pressurized pipeline and the analysis with the state equations , the stabilities during the transient processes of large fluctuation , tiny fluctuation and hydraulic disturbance for the hydropower station after extension are emphatically analyzed herein , and then a reliable basis for the design and the safe operation of the similar hydropower stations is given incorporated with the specific analysis made on the actual as well
基于综合有压管道特征线法和状态方程分析的联合算法,着重研究扩建增容引水式水电站的大波动、小扰动和水力干扰稳定性问题,并且结合实际算例作具体分析,为类似电站增容方案的设计和安全稳定运行提供可靠的依据。
7.In this case , when one of the machines be placed into the transition process of the vident fluctuating pressure for some kind of reason , the other machines would be affected become of the fluctuating pressure in the diversion system and drainage system of water in upstream and downstream which use the same one surge tank and the same one penstock with the machine , so the other machines would be put into transition process of fluctuating pressure , and become a kind of hydroelectric interfere
在高水头引水式水电站中,通常几台机组共用同一调压井,且共用压力主管。在这种情况下,当其中一台机组由于某种原因处于大波动过渡过程,则其在电站上下游引、尾水系统中引起的压力变化必然会影响与其共用调压井和压力主管的其它机组,使其它机组也处于过渡过程,形成一种水力干扰。
Similar Words:
"引水人作业区域" English translation, "引水入大田" English translation, "引水软管" English translation, "引水上山" English translation, "引水渗沟" English translation, "引水枢纽" English translation, "引水隧道" English translation, "引水隧洞" English translation, "引水台" English translation, "引水梯" English translation