| 1. | Analysis and enhancement of the traffic capacity of xuzhou railway station 徐州站通过能力分析及加强 |
| 2. | Hierarchical fuzzy timing petri net and determining carrying capacity of stations 网及车站通过能力评定 |
| 3. | Industrial - process control valves - part 2 - 3 : flow capacity - test procedures 工业过程控制阀.第2 - 3部分:阀的通过能力.试验过程 |
| 4. | The annual handling capacity and throughput of ningbo port have both exceeded 100 million ton 目前港口的通过能力和货物吞吐量均已超过亿吨。 |
| 5. | Convert b / p requirements into organized operation sequences , and pass competency assessment 根据蓝图要求组织加工工艺次序文件,并通过能力评估。 |
| 6. | A simulation system for computing the carrying capacity and resorting capacity of marshalling station 编组站通过能力和改编能力模拟计算系统的研究 |
| 7. | Calculated methods of carrying capacity for receiving and dispatching tracks at railway marshalling station 3 - stage 3 - yard 铁路编组站到发线通过能力计算方法 |
| 8. | During the whole process of construction , the operational safty and rapacity of track must be guaranteed 改建施工期内不影响正线运营安全,也不降低通过能力。 |
| 9. | Introduction and analysis of results of comprehensive wharf throughput capacity checking of coastal ports throughout china 全国沿海港口码头综合通过能力核查成果介绍与分析 |
| 10. | Convert b / p requirements into organized operation sequences , and pass competency assessment . proficient with nc program 根据蓝图要求组织加工工艺次序文件,并通过能力评估,熟悉数控编程。 |