Mobile
Log In Sign Up
Home > english-chinese > "扬水" in Chinese

Chinese translation for "扬水"

[ yángshuǐ ] 
pump up water
◇扬水泵 lift pump; 扬水站 pumping station


Related Translations:
扬水管:  ascending pipe
扬水蓄能:  pumped storage
扬水能力:  pumping capacitywater-raising capacity
扬水泵:  lift pump
扬水竖井:  pumping shaft
扬水高程:  water raising capacitywater-raising capacity
扬水机械:  water lifting machinery
扬水轮:  flap wheelscoop wheelscoop-wheel
扬水试验:  pumping test
扬水发电:  pumping power generation
Example Sentences:
1.Rating of direct coupled photovoltaic pumping systems
直接耦合光伏pv扬水系统的评估
2.Ustable speed pumped storage hydro
可?速扬水
3.Delivery valve installations connected with dry rising fire mains ; filling armaturs pn 16
消防水龙带连接供水阀. "干式”扬水管的供水配件pn16
4.Delivery valve installation connected with dry rising fire mains ; filling station and output station
消防水龙带连接供水阀. "干式”扬水管的供水装置及排
5.Sanitary system : 5 " sus pipe , water supply depends on high - low levels , total 195 horse - power lift pumps . 10 " pvc waste water trunk pipe , total 150 horse - power waste water pump
5 " sus管分高低层供水扬水泵共195马力10 " pvc排水干管污水泵共150马力
6.At last , through analysis on calculating results and comparison among operational schemes , it is concluded that if pull - in steady operation of pump unit can be successfully realized , then it provides the reasonable suggestions for design and operation of pump station
最后,通过对计算结果的分析及运行方案对比,判断机组能否顺利牵入同步和扬水,最终进入稳定工况运行,从而为泵站的设汁及运行提出科学合理的建议。
7.During processing the pumping station groundwork of the collapsibility loess in ningxia south mountainous area , we used the method of soil - exchanging to designing , constructing and collapsibility distortion observation on thickly layer , and found a conclusion that soil - exchanging on processing bad geological hydraulic engineering groundwork was a method of less investment , shorter project time and good effect
摘要通过对宁夏南部山区严重湿陷性场地建设扬水泵站的地基处理,和对换土法在深厚层湿陷性地基中设计、施工、沉降变形观测等的论述,得出水利工程在处理地基不良地质问题中,换土法具有投资少、工期短、效果好的结果。
8.Or , the project cannot play its due efficiency and even can be discarded in the midway . this will cause the great waste . the water intake of ningxia guhai pumping engineering and the water intake of yuejin channel on yellow river have been moved forward several times because of the silt
位置选择适宜,建筑规模合理,则可以节省工程投资,达到预期效果;位置选择不当,则有可能造成该工程不能发挥其应有的功效,甚至会中途废弃,造成极大的浪费,此现象不乏实例,如宁夏的固海扬水取水口,跃进渠黄河取水口因泥沙淤积就曾几次前移。
Similar Words:
"扬什韦尔马工厂" Chinese translation, "扬史末资" Chinese translation, "扬史末资机场" Chinese translation, "扬手" Chinese translation, "扬舒尔森" Chinese translation, "扬水泵" Chinese translation, "扬水发电" Chinese translation, "扬水高程" Chinese translation, "扬水管" Chinese translation, "扬水机" Chinese translation