Mobile
Log In Sign Up
Home > english-chinese > "承载能力极限" in Chinese

Chinese translation for "承载能力极限"

limit of bearing capacity

Related Translations:
承载电流:  carrying current
高承载:  high occupancy vehicle hov
承载强度:  load bearing strengthload-bearing strengthloading strength
网络承载:  ipoa iover atm atmnetwork carrying
承载系数:  bearing capacity factor
承载面:  bearing surfacecarrying facecarrying sidecarrying surfaceloading end
承载变性:  load metamorphism
承载梁:  carrier bar
承载值:  bearing value
承载率:  load factorload-carry duty
Example Sentences:
1.This resonance usually exceeds serviceability limit state and ultimate limit state ; endanger hydropower station ' s economic operation , even safe operation
这种共振往往超出厂房结构的正常使用极限状态和承载能力极限状态,威胁水电站的经济运行乃至安全运行。
2.Based on the conception that the simple beam rotates rigidly around the plastic hinge in the middle when the beam is at the ultimate state of anti - bending capacity , the formula for calculating the stress in the external tendons and the ultimate anti - bending capacity of the beam were developed
摘要在承载能力极限状态下,可把简支梁的跨中区段视为1个等曲率塑性铰(塑性区段) ,其余梁段可视为直线并处于绕塑性铰刚性转动的位置。
3.Secondly , according to the change of calculation formula when prestress were added to the chapter of concrete tower drum , the paper has given the calculation formulas of prestressed concrete tower drum in limited states of carrying capacity and normal serviceability
其次,针对高耸规范混凝土塔筒一章中增加预应力后,塔筒计算公式发生的变化,本文对预应力混凝土塔筒在承载能力极限状态和正常使用极限状态下的计算公式进行推导。
4.Abstract : in this paper , the strain and stress of prestresed reinforcement and common reinforcement are analyzed when ppc beams are in the states of ultimate hearing capacity and various groups of steel reinforcements are usedo the conditions to yield strength of prestressed and commen reinforcements are given too
文摘:本文分析了ppc受弯构件在达到承载能力极限状态下,在不同的钢筋级别搭配下,预应力钢筋和非预应力钢筋所产生的应变和应力,并给出了两者都达到其抗拉强度设计值所需的条件。
5.The data used by calculation program and post - processing are formed by dialog boxes , and fed back by figure . a finite element program which considers the influence of axial deformation can analyze the prestressed concrete frame structure , then the structure is designed according to the code of concrete structure gbj10 - 89 . post - processing can give the result of calulation by text file and graph , and plot construction drawings in autocad
前处理模块通过对话框采集数据来建模,并利用图形反馈建模结果;计算核心利用考虑了轴向变形的杆系有限元程序计算荷载效应和预应力效应,并按《混凝土结构设计规范》 gbj10 ? 89计算承载能力极限状态和正常使用极限状态;后处理模块通过文本文件和图形显示来完成结果查询,并直接在autocad环境下生成施工图。
Similar Words:
"承载能极限状态验证" Chinese translation, "承载能力" Chinese translation, "承载能力,承载值" Chinese translation, "承载能力标识单元" Chinese translation, "承载能力标示单元" Chinese translation, "承载能力极限状态" Chinese translation, "承载能力未许可" Chinese translation, "承载能力系数" Chinese translation, "承载能力信息单元" Chinese translation, "承载盘" Chinese translation