Chinese translation for "梁的应力"
|
- stre in beam
stress in beam
- Example Sentences:
| 1. | Stress calculation and stress distribution analysis of non - uniform beams 变截面梁的应力计算及其分布规律研究 | | 2. | Stress analysis of cfs strengthened rc box girders subjected to combined loadings 碳纤维加固复合受力钢筋混凝土箱梁的应力分析 | | 3. | Stress in beam 梁的应力 | | 4. | The tensile forces of main cable , the geometric alignments , the stresses of tower , suspenders , and stiffened beams in various stages were obtained 获得了各阶段大缆张力、几何线形及主塔、吊索、加劲梁的应力分布情况。 | | 5. | By fitting reasonable external prestressing tendons to ensure ultimate bearing capacity of the bridge , to ensure stress reserve of the main beam , to reduce effectively principal tensile stress , to renew line state of bridge structure and gradient 通过合理地设置体外预应力束,确保了该桥的极限承载能力;增大了主梁的应力储备;有效地减少了主拉应力;恢复了桥面线形和坡度。 | | 6. | And it investigates the appearance condition ( including joint , crack , eroding , corrosion , braking pole device rupture , crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot , at the same time , it also actually examines the stress of the beam , chemical ingredient , distortion and railway excursion , etc . through sampling , and based on the actually examined results , it checks and calculates the carrying capacity of crane - girder system . then , based on the investigating on the spot and the calculated result , it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder , analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack , institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant . finally , it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency 针对包钢初轧厂精整车间钢吊车梁上部区域出现裂缝这一问题,本文首先综述了国内外关于焊接钢吊车梁上部区域疲劳裂缝的研究现状;其次对整个吊车梁系统的外观情况(包括连接、裂缝、腐蚀、锈蚀、制动杆件断裂、吊车啃轨等)进行了现场调查,抽样实测了梁的应力、化学成分、变形及轨道偏移等,根据实测结果,对吊车梁系统的承载能力进行了验算;然后,根据现场调查及计算结果,探讨了焊接钢吊车梁上部区域疲劳破坏的机理,分析了重级工作制钢吊车梁出现疲劳裂缝的原因,制定了初轧厂精整车间破损钢吊车梁的加固方案;最后就重级工作制钢吊车梁上部区域出现疲劳裂缝的修复与加固方案提出了一些意见和建议。 | | 7. | In this paper , a generalized hybrid finite strip method is deduded for analyzing the shear lag effect in box girders . it has the advantage of the generalized finite strip method and hybrid stress element . shear lag effect in thin - walled box girder is analyzed with this method and stiffness matrix of generalized hybrid finite strip element is deduced . a calculating program for thin - walled box girder " s generalized hybrid finite strip method is compiled with fortran language and performed in visual fortran environment of pc computer . a typical example demonstrates that the proposed method has higher accuracy and efficiency , is suitable for analysis of shear lag effect in box girders 本文结合应力杂交元法和广义有限条法导出一种用来分析箱梁剪力滞效应的广义应力杂交有限条法,它兼有应力杂交元和有限条法的优点。运用这种方法对薄壁箱形梁的剪力滞效应进行了分析,推导出广义应力杂交有限条元的单元刚度矩阵,用fortran - 77语言编写薄壁箱形梁广义杂交有限条法程序( hfsbg . for )在visualfortran环境下运行。具体算例的数值结果表明:广义应力杂交有限条法用于计算箱形梁的应力分析具有很好的精度和效率,适合于分析箱形梁的剪力滞效应。 |
- Similar Words:
- "梁的翘曲" Chinese translation, "梁的凸缘" Chinese translation, "梁的弯曲" Chinese translation, "梁的弯曲曲率" Chinese translation, "梁的下翼缘" Chinese translation, "梁的缘条" Chinese translation, "梁的振动" Chinese translation, "梁的支承间距" Chinese translation, "梁的转角和托度" Chinese translation, "梁等" Chinese translation
|
|
|