| 1. | Productive test on phs slow - releasing fumigation 磷化氢缓释熏蒸的生产性试验报告 |
| 2. | Field test of phosphine recirculation fumigation in silo 磷化氢环流熏蒸在立筒仓中的生产性试验 |
| 3. | Development of new bio - enzyme catalyser carrier for water treatment 水处理酶促生物填料的生产性试验研制 |
| 4. | The test on cooling technology treatment of heating corn in flat silo 谷物冷却技术处理浅圆仓发热玉米的生产性试验 |
| 5. | Full - scale experiment on divergent tube for sludge disecharge from sedimentation tank 沉淀池扩张管嘴排泥装置的生产性试验 |
| 6. | The research of the full - scale experiment on saponin wastewater with constructed wetland treatment 人工湿地处理皂素废水生产性试验研究 |
| 7. | Full - scale studies of biological treatment of wastewater from traditional chinese medicine production 中药废水高效生物处理技术生产性试验研究 |
| 8. | Productive experiments on biological ceramsite filter for water pretreatment of the upper huangpujiang river 生物陶粒滤池预处理黄浦江上游水的生产性试验研究 |
| 9. | So far composite potassium permanganate is one of the advanced water treatment technology in domestic . based on the systematically analyzing the enhanced coagulation mechanism of composite potassium permanganate and powder activated carbon , the author carried on the laboratory and plant scale research on organic polluted yellow river in baotou two water factories with the combined process of composite potassium permanganate and powder activated carbon 高锰酸钾复合药剂强化混凝是目前采用的一种较为先进的水污染治理技术之一,本文在系统分析高锰酸钾复合药剂强化混凝机理、粉末活性炭强化混凝机理的基础上,进行了高锰酸钾复合药剂与粉末活性炭联用对黄河包头段两水厂有机微污染源水强化混凝的室内及生产性试验的应用研究。 |
| 10. | During the construction of the dam foundation cut - off for dalong water control project , the construction techniques adaptable to the construction under the condition with high interference , short construction period and strict quality standard are selected through the related productive experiment , with which the problems such as the prevention and treatment of hole collapse and lowering steel reinforcement cage and pre - embedded grouting pipe into place are solved , and then the successful construction of the cut - off is guaranteed as well 摘要在大隆水利枢纽坝基防渗墙施工过程中,通过生产性试验选择出了适合该防渗墙工程施工干扰大、工期紧、质量标准高的要求的施工技术,解决好了孔口塌孔的预防、处理及钢筋笼和预理灌浆管下设等技术难题,保证了该防渗墙工程的成功建设。 |