| 1. | Pile group effect of main pylon foundation of sutong bridge 苏通大桥主塔墩基础群桩效应研究 |
| 2. | Accuracy analysis about pier shaft construction survey of sutong bridge 关于苏通大桥墩身施工测量的精度分析 |
| 3. | Analysis of sutong bridge ' s influence on nantong city ' s economy social development 苏通大桥对南通经济社会发展的影响分析 |
| 4. | Analysis of anti - washing construction of fourth main tower pier of great sutong bridge 苏通大桥4号主塔墩基础防冲刷施工难点分析 |
| 5. | In order to get reliable construction parameters and design parameters of suzhou - nantong yangtze river bridge , 4 tests of piles were taken , including 7 piles with grouting 摘要苏通大桥为取得可靠的工艺参数和设计参数,共进行了4次试桩试验,其中包括7根压浆前后对比桩。 |
| 6. | Based on the construction practice of steel cofferdam for pier base of main pier no . 6 close to the pylon of sutong bridge , the key techniques for design and construction of the deep water double - wall steel cofferdams of the bridge are described 摘要以苏通大桥近塔墩主6号承台钢围堰工程实践为基础,介绍该桥深水双壁钢围堰设计、施工的关键技术。 |
| 7. | Yangtze river from shanghai to yibin , a total of 59 blocks yangtze river bridge ( yangtze river tunnel ) , which introduces su - bridge , the jiangyin yangtze river bridge , the jiangyin yangtze river highway bridge , yang changjiang river bridge 长江从上海至宜宾江段共59座长江大桥(长江隧道) ,这里主要介绍苏通大桥、江阴长江大桥、江阴长江公路大桥、扬中长江大桥。 |
| 8. | During the construction of sutong bridge , relevant parameters were identified in time through monitoring , data acquisition and analyses , and effective measures for parameter modification were proposed , thus ensuring the construction of the bridge with high quality and at high speed 文章阐述了苏通大桥施工中通过监测,数据采集,分析计算,及时识别有关参数并提出有效的调整措施,保证了大桥高质量、高速度施工。 |
| 9. | Combined with the introduction to the condition assessment system on runyang bridge which is the longest suspension bridge in china and sutong bridge which is the longest cable - stayed bridge in the world , the function and its constitution of this system are discussed in detail 结合润扬大桥悬索桥(国内最大跨度的悬索桥)及苏通大桥(世界在建最大跨度的斜拉桥)中的状态评估系统,介绍了该系统的功能以及模组构成。 |
| 10. | At last , the successful using of computed tomography in no . 1 pile in the left of honest 24 of f1 bid of su - tong bridge and no . 3 pile of honest 26 of wuhekou bridge of su - huai speedway , validate the reliability , advantage , and superiority of the computed tomography 文章的最后,运用超声波层析成像技术检测了苏通大桥f1标24前左1号桩以及宿淮高速公路五河口斜拉桥26号墩26 - 3号桩,取得了很好的效果,验证了层析成像技术的可靠性、先进性和优越性。 |