Chinese translation for "cell box girder"
|
- 多孔箱形梁
Related Translations:
girder: n.【建筑】纵梁,大梁,撑柱,撑杆,大型工字梁。 a framed girder构桁。adj.-less
- Example Sentences:
| 1. | Each bundle of strands is connected to one side of the center web of the two cell box girder . 每束钢缆锚固在双箱梁的中间腹板的一侧。 | | 2. | Multi - cell box girder 多孔箱形梁 | | 3. | Based on the minimum potential energy principal , the influences of three loads , which are concentrated force , trapezoidal load and sinusoid load , over shear lag of cantilever single - box - single - cell box girder are deducted and discussed , and a conclusion is reached , which has some instructive significance for designer to determine the sectional dimension and reinforcing bars ; the bending normal stress changes greatly as considering the shear lag effect 以最小势能原理为基础,推导并讨论了3种形式的荷载:集中力、梯形荷载、正弦形荷载对悬臂单箱单室箱形梁剪力滞的影响,得出考虑剪力滞效应后弯曲法向应力有较大变化的结论,对设计人员确定截面尺寸、截面配筋具有一定的指导意义。 | | 4. | The work in this thesis mainly includes following parts : 1 . as for box girder cross section , the three - bar stimulation method under typical loads and supports has been introduced . the force and stress formulae for flanges have been derived from the three - bar method . by reasonable simplification for multi - cell box girder , the three - bar method has been applied in multi - cell box girder ' s shear lag analysis 对于箱形截面主梁,本文介绍了三杆比拟法上、下翼板中比拟杆的计算公式,以及在典型荷载和支承的情况下翼板内各杆的应力计算公式,并对多箱式主梁截面进行合理简化,使三杆比拟法应用于多室箱梁的剪力滞分析。 | | 5. | There are two contents in this paper : one is solve the control differential equation of box girder " s shear lag by dq method , the other is rules of the shear lag for single - box - multiple - cell box girders . first we introduce what is shear lag and the status of research ; we introduce dq method and use dq method to solve several bridges in the third chapter ; also we introduce the software - ansys and analysis several bridges by ansys in chapter iii ; in chapter iv we assume several bridge models and get the stress distribution under concentrated load and distributed load ; we summarize the paper in chapter v and propose the advancing direction of shear lag 文章首先介绍了剪力滞定义及目前研究情况;第三章介绍了dq法以及用dq法解箱梁剪力滞控制微分方程的几个实例,说明了dq法在求解变截面箱梁剪力滞中的优势;第四章介绍了有限元软件ansys ,以及用ansys分析桥梁受力情况的几个例子,说明了用ansys中相关单元分析桥梁的可行性:第五章构造单箱双室、三室、四室的悬臂梁、简支梁模型,分别分析了他们在集中荷载、均布荷载作用下的受力情况。 |
- Similar Words:
- "cell bound antibody" Chinese translation, "cell bound immunoglobulin" Chinese translation, "cell bound receptor" Chinese translation, "cell boundary" Chinese translation, "cell box" Chinese translation, "cell breakage" Chinese translation, "cell breeding" Chinese translation, "cell brick" Chinese translation, "cell bridge" Chinese translation, "cell bridges" Chinese translation
|
|
|