Mobile
Log In Sign Up
Home > english-chinese > "man-hour quota" in Chinese

Chinese translation for "man-hour quota"

工时定额

Related Translations:
credit quota:  信贷规模银行同业拆借市场
hour format:  计时格式
machine hours:  机器运转时间机时
stolen hours:  春残魂断
idle hour:  空闲时数停工时间停机时间窝工时间闲频
customer hours:  顾客时间
prescribed hour:  规定小时
off hour:  业余时间
little hours:  1.夜半一二点钟。2.〔L- Hours〕 (天主教的)日间例行祷告课〔即晨祷,三时课,午祷,九时课等〕。
operational hours:  开放时间
Example Sentences:
1.Man - hours quota for equipment repair
设备修理工时定额
2.A model for calculation of man - hour quota based on ann is established
研究了基于人工神经网络的工时定额计算模型。
3.Dealing with calculation of man - hour quota , a new way of inormalization is explored . 3
研究了与子系统相关的零部件标题栏信息提取和入库方法;开发了相应的子系统模块。
4.On the basis of analyzing the structure of standard quota table , an approach for constructing a man - hour quota ann model using synthetical methods is proposed
在分析标准定额表结构的基础上,提出了用综合法构建计算工时定额人工神经网络模型的思路。
5.By analyzing the principle and calculation methods of man - hour quota , the work flow and system framework of cfmh are considered and designed . especially , the sub - system framework and funtion of calculating man - hour quota based on ann is studed . 2
研究了工时定额的制定原理及计算方法,介绍了计算机辅助模、夹具工时定额系统的工作流程和系统结构,论述了神经网络模型定额计算子系统的结构和功能。
6.Based on the design and development of computer - aided mould and fixure man - hour quota system ( cfmh ) , a method of calculating man - hour quota based on artificial neural networks ( ann ) is proposed in this thesis and a sub - system of calculating man - hour quota based on ann is also implemented
本文结合计算机辅助模、夹具工时定额系统( computer - aidedmouldandjigman - hourquotasystem , cfmh )的研制与开发,研究了基于人工神经网络模型的工时定额计算方法;并开发了相应的神经网络模型定额计算子系统模块。
7.By using matlab script language , the man - hour quota calculation model is described accurately . the input parameters of the model are selected from the parameters of the standard quota table and the train set is getten from the data of the table . meanwhile , the calculated results are post - corrected according to the applied part
以标准定额表的综合结构参数为网络输入、以表数据为训练集,采用matlab脚本语言构建了定额计算网络,同时对网络采用了后置数据处理最终确定了比较准确的工时定额数据,为工时定额制定的信息化、计算机化探索出一条新路。
Similar Words:
"man-hour basis" Chinese translation, "man-hour cost" Chinese translation, "man-hour coutput" Chinese translation, "man-hour evaluation" Chinese translation, "man-hour method" Chinese translation, "man-hour rate" Chinese translation, "man-hour report" Chinese translation, "man-hour requirement" Chinese translation, "man-hours quota for equipment repair" Chinese translation, "man-hua yang" Chinese translation