Mobile
Log In Sign Up
Home > english-chinese > "pipe liner" in Chinese

Chinese translation for "pipe liner"

管套;套管

Related Translations:
casing liner:  泵壳o型环壳体衬板装箱衬垫
natural liner:  天然垫料
stub liner:  短尾管
liner fleet:  班船队定期船队
tub liner:  贮槽衬里
liner centralizer:  衬管扶正器
truck liner:  卡车周转箱
air liner:  客机,班机。
aerial liner:  定期民航机。
case liner:  箱的衬里箱子衬垫
Example Sentences:
1.The mechanics character of wall rock distinctly affects suffered force and distortion of pipe liner structure
围岩的力学性质对管片衬砌结构的受力和变形有较大的影响。
2.If the character of wall rock is finer , it is smaller for suffered force and distortion of tunnel pipe liner structure , contrarily it is bigger
性态好的围岩,隧洞衬砌的受力和变形较小,反之则较大。
3.But displacement relatively value of pipe liner structure is very smallness , the tie - in of pipe liner would not move and come away . and it is bigger that the level displacement value of substrate tie - in of pipe liner than upper
而管片衬砌结构的位移的相对值却非常小,不会发生错动和脱开,且管片衬砌结构接头处的下管片较上管片的水平位移值稍大。
4.3 . under different kinds of wall rock and the same condition , from ii iii v kinds of wall rock , and conditions of construction period and operation period , it gradually increases that the maximum of displacement and the first main stress third main stress of pipe liner structure
3 、不同种类围岩在相同的工况下,从、 、类围岩看,不论是施工期还是运行期,管片衬砌结构的位移的最大值和第一主应力、第三主应力最大值都逐渐增大。
5.1 . under the same kind of wall rock and the same condition , displacement of pipe liner is symmetry , for tunnel structure and suffered load are symmetry . as level terra stress is bigger , the maximum of displacement and the first main stress occur in tie - in of pipe liner structure , and its direction is radial and points in hole ; the direction of the third main stress is annular and its maximum occurs in top and bottom hole inner
1 、同一类围岩在同一种工况下,由于结构和荷载的对称性,管片衬砌结构的位移也表现出对称性,因水平向地应力较大,位移最大值、第一主应力的最大值发生在管片衬砌结构的接头处,方向为径向指向洞内;第三主应力的方向为环向,较大值发生在洞顶和洞底内侧。
6.2 . under the same kind of wall rock and different conditions , the maximum of displacement and the third main stress of pipe liner structure in construction period is bigger than these of operation period , and the maximum of the first main stress of pipe liner structure in construction period is smaller than these of operation period
2 、同一类围岩在不同工况下,施工期管片衬砌结构位移的最大值、第三主应力最大值比运行期要大,施工期的管片衬砌结构的第一主应力最大值比运行期要小。
7.In this paper , it is studied and analyzed characteristic of stress , distortion etc . of pipe liner structure combining dahuofang transport water tunnel practice project , tunnel boring machine construction , and it is considered that affects internal force of pipe liner for early stress of underground structure and digging load . in nonlinear finite element calculation model , folium cells have been simulated among pipe liner and pipe liner and wall rock . under varies load condition , it has educed that changing rule of stress , distortion and load characteristic pipe liner in kinds of wall rock tunnel by analysis and calculation
本文结合实际工程,分析研究了大伙房水库输水隧道工程在采用掘进机施工方法的情况下,利用管片衬砌的结构应力、变形等受力特性,考虑地下结构初始应力和开挖荷载对衬砌内力的影响,采用薄层单元模拟衬砌管片之间、衬砌管片与围岩之间的非线性有限元计算模型,通过分析计算得出不同荷载工况下各类典型围岩段隧道衬砌管片受力特征、应力和位移变化规律。
Similar Words:
"pipe line steel" Chinese translation, "pipe line sud european societe du" Chinese translation, "pipe line supply" Chinese translation, "pipe line swivel coupling" Chinese translation, "pipe line under the ocean" Chinese translation, "pipe link" Chinese translation, "pipe locating device" Chinese translation, "pipe locator" Chinese translation, "pipe loop" Chinese translation, "pipe loss" Chinese translation