| 1. | Fabrication of precast segment at orientfund casting yard 制造中的桥身预制组件 |
| 2. | Commencement of transportation of precast segments to site 桥身预制组件运送到地盘 |
| 3. | Launching of precast segments of the rambler channel bridge 蓝巴勒海峡桥预制的桥面 |
| 4. | Fabrication of precast segment at hailong casting yard 制造中的桥身预制组件 |
| 5. | Fabrication of viaduct precast segments assembling of launching gantry 制造中的桥身预制组件 |
| 6. | Precast segment erection bridge c1 c2 construction C1及c2段桥建造 |
| 7. | Constructed viaduct at ha tsuen precast segments erected by launching girder 兴建中的厦村高架路 |
| 8. | Precast segment erection with lifting frames 用吊架安装预制构件 |
| 9. | Un - loading precast segment from barge with segment lifting frame 用吊架把预制构件由趸船吊上临时桥 |
| 10. | The optimization of mixing design and steam - curing technology for tbm precast segments 预制管片混凝土配合比设计与蒸养工艺优化 |