Mobile
Log In Sign Up
Home > english-chinese > "productive time" in Chinese

Chinese translation for "productive time"

生产时间
生产性时间
作业时间


Related Translations:
productive:  adj.1.生产的,生产性的;有生产力的;多产的。2.产生[出产]…的 (of)。短语和例子productive labour 生产劳动。 productive forces 生产力。 an age productive of great men 伟人辈出的时代。 productive of great annoyance 会产生巨大麻烦的。 productive soil
productive department:  生产部
productive cooperation:  生产合作社
productive pool:  产油油藏
productive manpower:  生产人工
productive thinking:  创作性思维
productive maintenance:  生产维护生产维修生产性检修生产性维修
productive resistance:  生产阻力
productive zone:  生产层生产地带
productive construction:  生苍建设生产性建设
Example Sentences:
1.Get up a half - hour earlier to gain some especially productive time
早起半小时,获得特别高效的时间。
2.During the most productive time in her career , she wrote five novels
在她创作生涯中最多产的时期,她写了五本小说。
3.During the most productive time in her career , she write five novel
在她创作生涯中最多产的时期,她写了五本小说。
4.Ensuring that all productive times are correctly recorded by always clocking work order and daily time card together and writing the work order number and the work item
通过在工作单和每日时间卡上打卡,确保正确记录所有生产时间,并记录工作单号和工作项目。
5.Before implementing network planning , productive time of a working procedure is unknown . therefore , the paper presents two methods which judge the possibilityof a working procedure
在网络计划实施之前,工序作业时间是未知的,因此,本文提出二种判定工序实现可能性的方法。
6.But it is difficult to determine the productive time of a working procedure , there is uncertainty of it . this uncertainty is random , fuzzy and intermediate uncertainty , which can be dealed by connection number method
然而在许多情况下,估计项目活动持续时间是非常困难的,项目活动时间具有不确定性,联系数是用来处理模糊,随机,中介不确定性的系统理论和方法。
7.Method 1 is based on spa method of comprehensive judgment . case ( 1 ) : several experts in this field estimate connection number of productive time of a working procedure . expression of connection number is got by method of comprehensive judgment , which considers every experts suggestion
方法一:基于集对分析的工序作业时间综合评价法:情况(一) :由若干名领域专家分别估计出工序作业时间的联系数表达式,用综合评判法得出全面考虑各名专家意见的用联系数表达的工序作业时间。
8.Factors which influence productive time of a working procedure , can be divided into several grades , four grades in this thesis , that is : { absolutely completion , completion , probable completion , unable completion } . corresponding elements of state sort table are adopted , that is four elements state sort table . connection number expression is found by the method of weighted value
对影响工序作业时间的若干影响因素( f _ 1 f _ n ) ,可以根据需要将评判结果分为几个级,比如分为{肯定完成,能完成,可能完成,不能完成}四个,那么应采用相应元数的态势排序表,即四元态势排序表;然后运用加权平均法求出工序作业时间的联系数。
Similar Words:
"productive territorial complex" Chinese translation, "productive territorial structure" Chinese translation, "productive thinking" Chinese translation, "productive tiller" Chinese translation, "productive tiller stage" Chinese translation, "productive trait" Chinese translation, "productive unit" Chinese translation, "productive value" Chinese translation, "productive viewpoint" Chinese translation, "productive wages" Chinese translation