| 1. | The forecast technology of project duration 项目工期预测技术。 |
| 2. | The sequence in which tasks occur can affect the project duration 任务的先后顺序会影响项目的工期。 |
| 3. | Research on engineering project duration risk based on fuzzy network 基于模糊网络的工程项目工期风险评估研究 |
| 4. | Shortening the duration of a critical task can shorten the project duration 缩短关键任务的工期可以缩短整个项目的工期。 |
| 5. | The timing and sequence of tasks within a project , as well as the project duration 项目和项目工期中任务的时间安排及先后次序。 |
| 6. | Or , if your project duration is very short , you might have little time or need to track tasks 或者,如果项目的工时非常短,就可能没有时间或必要对任务进行跟踪。 |
| 7. | These latter two types of links automatically overlap tasks , which tends to decrease the overall project duration 后两种链接类型自动地重叠任务,这将趋于缩短项目的总工期。 |
| 8. | In one stroke , you can shorten the project duration , reduce the number of required resources , and slash costs 这种改变可以缩短项目的工期,减少所需的资源数量,以及削减成本。 |
| 9. | An effective way , then , to decrease the project duration is to look for instances where you can replace fs links with either ss or ff links 因此,缩短项目工期的一个行之有效的方法就是:查找可以将fs链接替换成ss或ff链接的情况。 |
| 10. | To develop a localised discrimination measurement by modifying the protocol developed by the unaids with data collected . project duration : 1 october 2001 to 1 august 2002 改良联合国爱滋病规划署制定的准则,并?集有关资料,以订定评估本港歧视情况的方法。 |