| 1. | Testing sprayed concrete - flexural strengths first peak , ultimate and residual of fibre reinforced beam specimens 检测喷射混凝土.纤维钢筋梁的挠曲强度第一峰最后和残余 |
| 2. | Structural use of concrete - design charts for singly reinforced beams , doubly reinforced beams and rectangular columns 混凝土的结构使用.第3部分:单配钢筋梁双配钢筋梁和矩形柱设计图 |
| 3. | Such simplified formula ( 2 . 17 ) cannot only accurately calculate the flexural capability of bonding - reinforced beams , but its calculated results have definite security 结果表明,该公式的计算值不仅具有较好的精度,且偏于安全。 |
| 4. | As a result , the fatigue life of intact reinforced beams increases by 60 % - 80 % . 4 . owing to many existing bridges to be reinforced exists different harm to some 5 、通过完好加固梁与损伤加固梁的对比试验,首次定量给出了梁的损伤对混凝土加固梁疲劳性能的影响。 |
| 5. | The inclusion of reinforced beams in a reinforced concrete floor adds to its strength and loading capacity . this system is very often used in factory and warehouse floors 含有加劲梁的钢筋混凝土楼面可以提高楼面强度及其承载力。这种体系常用来建造厂房和仓库的楼面。 |
| 6. | In this paper , static load experiments are illustrated and the reliability of cfrp reinforcement technology , used for reinforcing beam slab structure of large span bridge , is discussed 文章结合对大跨度桥梁的梁板结构加固处理前后的静载试验,探讨了大跨度梁板结构应用粘贴碳纤维加固处理技术的可靠性。 |
| 7. | As the preheater tower span of large scale nsp cement plant is great and the internal stress of single beam and pole is also great , steel structure and reinforced beam / pole be used widely because of their special performance 摘要近十年来,由于大规模水泥厂窑尾塔架跨度大,单根梁柱的内力大,钢结构梁柱和钢管混凝土柱因其特有的性能优势得到了广泛的应用。 |
| 8. | The testing results indicate that the hrb400 continuous reinforced beam not only can achieve plastic internal force redistribution thoroughly and also has enough capability in the amplitude adjustment and can achieve the quotient designed 试验研究结果表明, hrb400级钢筋混凝土两跨连续梁能够达到完全的弯矩重分布,并且具有足够的调幅能力,能达到设计的调幅系数。 |
| 9. | This paper take the junction panel of the front reinforced beam in the back automobile floor for the example , introduces the drawing die design process , which proves this method simplified the design process , enhanced the rated capacity 本文以汽车后地板前加强梁左右连接板为例介绍了汽车覆盖件拉延模具设计,经过实践应用,证明该方法简化了设计过程,提高了设计效率。 |
| 10. | Meanwhile , the results of program show that , under secondary load , the bonding - reinforced beams " yield - moment would decrease as the original load increase , but the original load would n ' t remarkably influence the ultimate flexural capacity 同时,程序计算结果表明,加固梁在二次受力的作用下,屈服弯矩随着初始荷载的增加而减小,但极限抗弯承载力受初始荷载影响较小。 |