Construction method of pouring concrete pre - stressed connection beam 现浇预应力混凝土连系梁施工方法
2.
The reflection of this in the current reading teaching is : we are stressing the creation but opposing presumption ; we are stressing connection but opposing isolation ; we are stressing the process but opposing the result 在阅读教学中体现为:重创造而反对预设、重联系而反对孤立、重过程而反对结果。