| 1. | Troubleshooting and root cause analysis for test failure unit 分析和维修测试不良品 |
| 2. | Test failure is reported as a single line status 测试失败作为单行状态报告;报告符合 |
| 3. | Do procedures exist that define what to do in the event of test failures 是否有程序来界定当测试不通过时要做什么? |
| 4. | Do procedures exist that define what to do in the event of test failures 对与测试坏品,有无存在一个定义了应该怎么做的流程? |
| 5. | Do procedures exist that define what to do in the event of test failures 是否存在对测试不良结果如何处理有作定义/规定的程序/规程? ? |
| 6. | The main challenge for us was to make anthill report the test failures and still publish the test results 我们的主要挑战是让anthill报告失败的测试并且仍然发布测试结果。 |
| 7. | This paper models the failed test by using the finite element method and the results explained the reason of the test failure 本论文通过有限单元法对试验过程进行了模拟,计算结果解释了试验现象。 |
| 8. | Leaving continue after failure unchecked means that the ordered test will stop running after the first occurrence of a test failure 不选中“失败后继续”表示在首次发生测试失败后,顺序测试将停止运行。 |
| 9. | As soon as jester detects a single test failure , it aborts the run , so failing as early as possible can short - circuit a lot of time - consuming extra tests 只要jester发现一个测试失败,就会终止运行,所以尽早失败可以短路大量耗时的额外测试。 |
| 10. | At the same time , the corresponding programs on the above two methods can be compiled in frotran90 respectively , which are used to analyze the influence of several factors on behaviour of barrette pile group and barrette pile group - soil - cap interaction , including collocation of pile , ratio of length to width , pile spacing , ratio of depth to equivalent diameter , ratio of modulus of pile to soil , possion ' s ratio , the finite layer , the number of piles etc . lastly a series of model tests on vertically - loaded bahaviour of single pile are made , tests results are analyzed , and the causes of tests failure are preliminarily discussed in this paper 分析了群桩布置形式、长宽比、桩与桩之间的相对距离,桩径比、桩土刚度比、泊松比、有限压缩层深度以及群桩根数等因素对壁板桩群桩和壁板桩群桩?土?承台的相互共同作用问题的影响。论文最后做了一组壁板桩和圆形桩单桩模型试验,对试验数据进行了分析,并对试验中存在的问题进行了初步探讨。 |