| 1. | The cable is then tensioned and anchored at the ends . 然后将钢索张拉并锚固于端头处。 |
| 2. | Design and construction analysis of a semi - tensegrity 类张拉整体平板结构的施工分析 |
| 3. | Standard test method for peel cling of stretch wrap film 张拉材料剥离的标准试验方法 |
| 4. | Connection design in a tensioend fabric structure 张拉膜结构的连接设计分析 |
| 5. | Guide for reduction of risk of injury for archery overdraws 降低弓箭张拉过大造成伤害风险的导则 |
| 6. | Development and application of a post - tension rail sleeper mould 一种后张拉轨枕模具的开发与应用 |
| 7. | Parameter analysis for shaping process of steel tension truss 张拉整体桁架钢结构成型过程参数分析 |
| 8. | One - time pretensioning analysis method for prestressed space truss 预应力空间网架结构一次张拉计算法 |
| 9. | Numerical simulation and monitoring of prestressing tendon process 预应力筋张拉过程的数值模拟与监测 |
| 10. | The method of post - tension in batches 后张预应力分批张拉法 |