Mobile
Log In Sign Up
Home > english-chinese > "施工承包商" in Chinese

Chinese translation for "施工承包商"

construction contractor

Related Translations:
捷运承包商公司:  express contractors
水利工程施工:  hydraulic engineering construction
施工队长:  spread superintendent
作业施工:  job execution
施工编号:  construction number
施工车辆:  construction vehicle
施工监测:  observation during and after construction
施工规程:  construction regulations
铺面施工:  pavement construction
施工技术:  co truction technologyconstruction techniqueconstruction technologyengineering tchniquesengineering techniquesoperating technique
Example Sentences:
1.The solution for all problems , which were arising during the construction process , has fully fallen upon the construction players
作者认为,对于施工阶段所产生各类问题的解决完全取决于业主、施工承包商等。
2.Minimum 2 international industry project experience on pm or cm ' s role in epcm contractor or construction contractor ' s team
作为施工经理或者项目经理在工程公司或者施工承包商的团队中,参与过2个以上的国际工业工程项目。
3.Minimum 1 international industry project experience on lead field engineer or project engineer ' s role in epcm contractor or construction contractor ' s team
作为施工技术负责人或者项目工程师在工程公司或者施工承包商的团队中,参与过1个以上的国际工业工程项目。
4.Besides , in case of disagreements , the owners and a / es should keep all the pertinent and relevant records along with the contractors , which will settle the matters later
此外,在业主和建筑工程师的意见不一致时,他们必须与施工承包商保留所有中肯、相关的记录,这有利于今后问题的解决。
5.Project owners can able to recognize warning signs of a potential claims , and volunteer to stretch their hands for cooperation and to work as a team with the contractors , without any consequences creates high chances that the project will be completed successfully with the required quality , on time , within budget and without excessive expense and lengthy arbitration and litigation - in the courtroom
业主要及时发现潜在的索赔警告信号,并加强与施工承包商的合作,以使工程项目取得成功,即按时保质完成工程项目,并将工程费用控制在预算内,尽量避免长时间的仲裁和诉讼。
6.The main points of hlsip quality control includes : during the design stage , it is necessary to control the scheme comparison and optimum design , esp . the waterwork , electromechanical device and irrigation region planning , to improve the design quality and pay attention to control the long - term benefits of design results ; during construction period , the supervisor should help proprietor choose construction contractor , sign the construction contract , supervise the manufacture of equipment and strictly execute the quality control procedure to subject the construction to controlled mode ; in addition , the contractors must improve their quality self - control , maintain the notion " quality first " and insist the full process , multiway , and multi system control of construction quality
高扬程梯级提水灌溉工程质量控制的重点包括:设计阶段控制好方案对比、设计优化,特别是水工建筑、机电安装、灌区规划等多专业多目标的确定和协调,提高设计质量和深度,注重控制设计成果的长期效益;施工阶段协助业主选择好施工承包商,制定出严谨、完备的施工合同,搞好设备监造,严格执行质量控制程序,使工程施工时时处于受控状态;同时要提高承包商的质量自控能力,坚持施工质量的全过程、多方法、多体系控制。
Similar Words:
"施工程序;施工步骤" Chinese translation, "施工程序表" Chinese translation, "施工程序图" Chinese translation, "施工程序网络图" Chinese translation, "施工承包" Chinese translation, "施工次序" Chinese translation, "施工贷款" Chinese translation, "施工单" Chinese translation, "施工单位" Chinese translation, "施工导流" Chinese translation