| 1. | Commercial building telecommunications cabling standard 商用建筑电信电缆敷设标准 |
| 2. | Temporary restricted zone on chui lok street , tai po 临时限制区,以便进行电缆敷设 |
| 3. | Guide for installation methods for generating station cables 发电站电缆敷设方法指南 |
| 4. | Floyd - dijkstra algorithm applied to the design of cable laying 算法在电缆敷设设计中的应用 |
| 5. | Customer - owned outside plant telecommunications cabling 用户持有的外部设备远程通信电缆敷设 |
| 6. | Information technology - cabling systems pack 信息技术.电缆敷设装置 |
| 7. | Installation environmental temperature should not lower than 0 电缆敷设时的环境温度应不低于0 |
| 8. | Aircraft assembling technology cable laying 飞机装配工艺.电缆敷设 |
| 9. | The ambient temperature under installation should not below 0 电缆敷设时环境温度应不低于0 。 |
| 10. | The ambient temperature under installation should not below 00c 电缆敷设时环境温度应不低于00c 。 |