Mobile
Log In Sign Up
Home > chinese-english > "tianshengqiao" in English

English translation for "tianshengqiao"

天生桥
Example Sentences:
1.Tests on the core loss of the stator of no . 6 generating unit of tianshengqiao second - cascade hydropower station
天生桥二级水电站6号发电机定子铁损及温升试验
2.The three provincial maritime administrations jointly in action for waterborne safety in the tianshengqiao reservoir areas
三省海事携手共促天生桥库区水上安全
3.Preparation of the bidding documents for the civil works of the tianshengqiao - 1 hydropower station and its bidding
天生桥一级水电站土建工程招标文件的编制与实施
4.This paper presents mainly the layout of monitoring system , monitoring items and operation of monitoring equipment for tianshengqiao concrete - faced rockfill dam
着重介绍天生桥一级面板堆石坝大坝监测系统的布置、监测项目及观测仪器的运行情况。
5.Abstract : this paper gives an account of the service behavior of dam safety monitoring system of tianshengqiao hydorpower station during construction period , impounding period and operation period , with comparing the deformation conditions of the dam before and after impounding and the behavior of the dam since its operation
文摘:通过大坝安全监测,天生桥一级水电站大坝安全监测系统在施工期、蓄水期及运行期的工作性态,比较水库蓄水前后大坝各项监测内容的变形情况以及大坝运行到目前的工况。
6." field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures " , the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level . the research findings were adopted in such large - scale projects as the tianshengqiao water contral project , ming tombs water control project . dahe water contral project , ming tombs water control project , dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power . ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power . ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit . ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit . ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir
“高堆石坝原位观测和反溃分析研究”及“高土石坝动力分析及抗震工程措施研究”咨询项目提出了具有开拓性的观点与方法,经电力工业部鉴定评为国际先进水平,该两项成果已应用于天生桥、十三陵、大河、莲花等大型工程获电力工业部科技进步二等奖; “坝料土动力应力应变关系的研究”咨询项目获电力工业部科技进步二等奖, “徐州发电厂灰坝加固工程勘测试验与计算分析”咨询成果已被华东电力设计院设计采纳,工程效益显著; “瓮福磷石膏渣场工程土工试验与数值分析”咨询成果已应用于国家重点工程瓮福矿肥基地建设,效益显著; “克孜尔水库工程原型观测数据库与资料分析”咨询项目为水库运行与管理提供了有力保证。
Similar Words:
"tiansheng" English translation, "tiansheng ji" English translation, "tiansheng sword" English translation, "tiansheng xu" English translation, "tianshenggang" English translation, "tianshi dao" English translation, "tianshi xiang" English translation, "tianshifu" English translation, "tianshui" English translation, "tianshuihai" English translation