English translation for "上承式"
|
- deck type
Related Translations:
禀承: in accordance with; obedience to; take orders; receive commands 承插管: bell-and- igot piptbell-and-socket pipespigot and faucet pipe 承保: accept insurance; under writing; acceptance; underwrite◇承保单 cover note; open cover; 承保范围 insurance coverage; scope of cover; 承保人 underwriter; insurer; 承保通知书 (火灾保险) cover note; 承保限额 underwr 票据承: acceptance of bill of exchange 承病: gargoylismhurlers syndrome
- Example Sentences:
| 1. | This thesis will emphasis research the technique of reinforcing experiment test on the top - bear type armor plate the beam , especially to the 40 - meter top - bear type armor plate beams of the big bridge of yellow river of zhengzhou 本文重点研究上承式钢板梁特别对京广郑州黄河大桥40米上承式钢板梁的加固技术实验测试。 | | 2. | With the actual locale incestigating , the actual locale testing and the theories analyzing of the reason of the diseases producing of the exceed limit of horizontal swing and steel pole ' s break , and summaried the reinforcing measure of the top bear armor plate beam 通过对京广线郑州黄河大桥40米上承式钢板梁横向摆动严重超限及钢梁杆件断裂等情况的现场调查、现场测试和理论分析及病害原因产生的机理,总结提出了上承式钢板梁的加固措施。 | | 3. | For do n ' t delive the horizontal power , connect method adopt the double hingle connect , and made both girder just to deliver the horizontal power each other , and vertical power can change position , this the problem that the top bear armor plate beam do n ' t accommodate the increasing in speed had been resolved radical 为了不传递竖向力,连接方式采用双铰接,使两孔梁只能相互传递横向力,竖向可以变位,从而基本解决了上承式钢板梁不适应提速问题。 | | 4. | Because of the original design standard was low , the horizontal angur rigidity is serious lack , when the high speed train passes , the exceed limit of the horizontal swing had affected the lifting of the main trunk line , these diseases had been existed earlier but had not been gotten to resolve radical , and along with the increasing in speed of railroad train , these diseases performance will be more seriously , it ' s time for resolve 同时提速列车对桥梁结构的动力作用增大,特别是对上承式钢板梁。由于原设计标准低,横向刚度严重不足,高速列车通过时横向摆动严重超限等已严重影响了主要干线的提速,这些病害很早就存在但没有得到根治,随着列车提速,这些病害表现越来越严重,已到了必须整治的时候了。 | | 5. | Based on qualitative analysis and comparison of several options for suppressing transverse vibration on deck type steel plate girder of railway bridge , conclusions are made as follows : with static reinforcing , the vibration amplitude can be suppressed to some extent , but quasi - resonance of the bridge can not be avoided , moreover , the construction is inconvenient and costly . with option of two bridge connection , the effectiveness of vibration suppression is clear ( the damping ratio approaches 50 % ) and it is fairly economic and easy , however , the quasi - resonance of the bridge can not be avoided either . with dynamic option ( mtmd option ) , the quasi - resonance of the bridge can be effectively avoided ( the damping ratio is up to 51 . 38 % as tested in field ) , moreover , the construction cost is low , and the construction is simply and convenient 通过对目前抑制铁路上承式钢板梁桥横向振动的几种方案进行定性的分析和比较,认为:静力加固方案可以使桥梁振幅有所减小,但不能避免准共振现象的发生,而且工程造价较高,施工也不方便;两桥连接方案减振效果明显(减振率近50 % ) ,比较经济也比较方便,但同样不能避免准共振现象的发生;动力减振方案( mtmd抑振方案)可以有效的抑制桥梁的准共振现象(现场试验中减振率达51 . 83 % ) ,而且工程造价较低,施工简单、方便。 | | 6. | It is a top load bridge with a clear span of 288m , which is maximum one of the same structural system in asia . the main arch rib uses 8 steel tube of 920mm joined by web members and transverse truss to form a space truss . the soldier piles on the arch are made of bent frame to make the shape both artistic and novel 梅溪河大桥为一净跨达288米的上承式钢管混凝土拱桥,是目前亚洲同类桥型中跨度最大的桥梁,其主拱肋采用8根920mm的钢管,通过腹杆及平联形成钢管混凝土空间桁架,拱上立柱亦采用钢管混凝土排架,造型新颖美观。 | | 7. | According to the bearing load institute of mainly bearing component , the basic form of bridge can be classified into beam bridge , arch bridge , rigid frame bridge , suspension bridge and assembly system bridge etc . also according to the location of trip lane , it can be classified into top travel bridge , middle travel bridge and lower travel bridge 桥梁的基本形式按桥梁主要承重构件的受力情况可分为:梁桥、拱桥、刚架桥、悬索桥、组合体系桥等;按行车道的位置又可分为上承式桥、中承式桥和下承式桥。 | | 8. | 2 . detailed introductions are given for the design scheme and engineering situations . 3 . the construction design , construction scheme and construction technology of ballastless embedded sleeper track are researched in combining with the constructing of the ballastless track on shahe bridge inside b26 - 1 section on qin - shen railway . the design , application and construction measure for the adjustable up - supporting bracket for track panel are particularly described and expatiated 结合秦沈客运专线b26 - 1标段内沙河无碴轨道实际施工情况,对长枕埋入式无碴轨道的总体施工安排、施工方案以及施工工艺进行了研究,同时重点对长枕埋入式无碴轨道的上承式可调式轨排支撑托架的设计、使用和施工测量控制进行了细致地说明和阐述。 |
- Similar Words:
- "上承拱腹" English translation, "上承结构" English translation, "上承梁" English translation, "上承桥" English translation, "上承桥,跨线桥。" English translation, "上承式大梁" English translation, "上承式叠板弹簧" English translation, "上承式桥" English translation, "上承式桥式起重机" English translation, "上承式悬臂桥" English translation
|
|
|