| 1. | Essentials of design of the light - duty well - points system 轻型井点系统设计要点 |
| 2. | Set up light well points along east side fence 在场地东侧沿围墙内侧布设轻型井点设备 |
| 3. | Dewatering technology for deep foundation pit 深基坑井点降水施工技术 |
| 4. | Construction practice of deep foundation pit well - point dewatering 深基坑井点降水的施工与实践 |
| 5. | Set up the light well point pipe inside of east anti - extrusion ditch 轻型井点管布设于场地东侧的防挤沟内 |
| 6. | Discharge the water from light well point into site drainage directly 轻型井点抽出的水直接排入现场排水沟内 |
| 7. | Application of biot model in well - point dewatering causing ground movement 比奥模型在井点降水引起地面变形中的应用 |
| 8. | The application of mildtype well point precipitation decrease underground water level method in project 轻型井点降水法在工程中的应用 |
| 9. | Lightweight well point dewatering construction method amp; amp; calculation in well with multiple pipes 多管井轻型井点降水施工方法及计算 |
| 10. | Designing of well point of deep foundation ditch and problems in its operation and its solution 深基坑井点降水设计与施工中的问题及其对策 |