| 1. | Design and downhole operation of continuous gas lift 连续气举采油井设计及施工作业 |
| 2. | Design and application of lateral horizontal completions 分支水平井完井设计与实践 |
| 3. | Specification for design of combined sewage intercepting well 合流制系统污水截流井设计规程 |
| 4. | Design of coal bed methane well test 煤层气试井设计方法 |
| 5. | Tarui design orc 垂井设计制作所 |
| 6. | According to the plan for the composite energy removal construction , the article analyses the technology in the terms of theory 本文根据综合式消能井设计方案,对其技术进行了理论分析研究。 |
| 7. | The key of the well test design for productivity is to design reasonable nozzle in order to obtain steady and reliable productivity and pressure data 产能试井设计中的关键就是设计合适的油嘴,以获得稳定可靠的产量和压力资料。 |
| 8. | The quantitative relations between sand production and percolation flow velocity in horizontal well are described by the experimental study , which supplies a reference basis for horizontal well completion design 通过试验结果定量分析和描述了水平井地层出砂与流体渗流速度的关系,为水平井完井设计提供了参考依据。 |
| 9. | The actual field practice has shown that it can improve the cementing quality of adjustment wells apparently to control dynamic interferes of formation factors , to use the temporary plugged screen , to adjust the mud property , and to optimize cementing project 现场实际施工表明:控制地层因素动态干扰、使用屏蔽暂堵技术、调整泥浆性能、优化固井设计等可以明显提高调整井固井质量。 |