| 1. | The scheme of flood handling during construction period of gongboxia hydro - power station 公伯峡水电站施工渡汛方案 |
| 2. | Excavation of left - bank flood discharging tunnel at gongbo gorge hydropower station 公伯峡水电站左岸泄洪洞开挖施工 |
| 3. | ( 2 ) the optimal design of cofferdam and diversion during flood period ( 2 )公伯峡水电站施工围堰及导流渡汛优化设计。 |
| 4. | Study of stability of the exit trench slope in gongboxia hydropower station 公伯峡水电站出口明渠边坡稳定性的力学分析与防治研究 |
| 5. | Controlled quarry blasting for dam - filling materials in spillway at gongbo gorge hydropower station 公伯峡水电站溢洪道坝料开采爆破控制 |
| 6. | Research on the assessment system for water economization and power generating improvement of gongboxia power station 公伯峡水电站节水增发考核方法研究 |
| 7. | Vibration monitoring for fresh concrete during plant foundation rock blasting at gongbo gorge hydropower station 公伯峡水电站厂房基础岩石开挖爆破对新浇混凝土振动影响监测成果 |
| 8. | The main results of the paper are as follows : ( 1 ) the flood analysis on gongboxia hydro - power in construction in 2002 其主要研究成果如下: ( 1 )公伯峡水电站2002年施工洪水分析。 |
| 9. | 3 . parameters of rheology model have been obtained by careful experimental study of the chief materials of the faced rockfill dam in gongboxia water power station ( 3 )结合在建的公伯峡水电站混凝土面板堆石坝工程进行堆石料流变模型试验研究,得到流变模型参数。 |
| 10. | Through studying longyangxia reservoir reasonable operation mode , gongboxia hydro - power station ' s flood period scheme and improvement flood period standard scheme are established in this paper 通过龙羊峡水库合理运行方式研究,确定公伯峡水电站渡汛方案以及提高渡汛标准方案。 |