| 1. | Stay cable vibration and its damping measures of cable - stayed bridge 斜拉桥拉索振动及其减振措施 |
| 2. | Part five : test analysis of the vibration of the second pump and the pole with the vibration mitigation and additive energy dissipating equipment 第五章: 2 #泵管系与阀杆附加耗能减振措施后的振动测试分析。 |
| 3. | According to the control of noise resource , vibration absorbing , and vibration isolation , this paper provides several measures on the rail structure to solve the problem 从声源的控制,隔振,吸振三方面着手,提出轨道结构方面的减振措施。 |
| 4. | The main factors causing vibration and the proposed approaches for improving the dynamic characteristics of the strip chopping no - till planter have been discussed 为了减轻机具的振动,专门对播种机的振动进行了田间测试,探讨了减振措施。 |
| 5. | In addition , two kinds of vibration - decreasing measures are applied on the rail lines with big vibration , and the effects of decreasing vibration are also analyzed comparatively 对振动较大的轨道沿线采用了两种不同的减振措施,并对减振效果进行分析比较。 |
| 6. | The methods to reduce vibration of i . c . engines are analyzed in detail and some problems about active control over vibration of i . c . engines are discussed in this paper 本文详细分析了对内燃机振动所采取的一些主动减振措施及实施情况,并探讨了内燃机振动的主动控制问题。 |
| 7. | Abstract : the methods to reduce vibration of i . c . engines are analyzed in detail and some problems about active control over vibration of i . c . engines are discussed in this paper 文摘:本文详细分析了对内燃机振动所采取的一些主动减振措施及实施情况,并探讨了内燃机振动的主动控制问题。 |
| 8. | First , the common phenomenon and characteristics of the wind - induced vibration is described . then , the classification of damp and the mechanism by which damp can diminish the vibration is introduced 首先描述了斜拉索常见的风致振动及其振动的特点,同时介绍了目前斜拉索的减振措施及其存在的问题。 |
| 9. | ( 3 ) the vibration types and physical course of the tilting gate were elaborated , the causes of all kinds of the vibration were analyzed , and then the corresponding shock absorption measures were put forward ( 2 )分析阐述了翻板闸门振动类型及其物理过程研究,对各种振动的原因进行了分析,同时也提出了相应的减振措施。 |
| 10. | So the solution is obtained by ansys . at those places with excessive vibration along the lightway , two field measures ( wave impending block and isolation trench ) were adopted to reduce vibration 并在振动较大的地方采用了wib ( waveimpendingblock )和隔振沟两种减振措施,同时对减振效果进行了分析比较,得到了较为理想的结果。 |