| 1. | Method of eliminating electric arc train passing through insulted joint 地铁列车通过绝缘结消弧方法的研究 |
| 2. | When the vehicles pass the railway bridge , it will cause the vibration of bridge 列车通过铁路桥梁时,引起桥梁的振动。 |
| 3. | A test on pressure variation in tunnels with high - speed trains passing through 高速列车通过隧道时隧道内压力变化的试验研究 |
| 4. | Analysis of the pressure wave variation generated by a high - speed train passing through a tunnel 高速列车通过隧道时压力波动过程的模型试验 |
| 5. | Experimental study on phenomenon of high - speed railway train passing through tunnel with trumpet - shaped entrance 高速列车通过喇叭形入口隧道的试验研究 |
| 6. | Mechanical vibration - measurement of vibration generated internally in railway tunnels by the passage of trains 机械振动.列车通过铁路隧道产生振动的测量 |
| 7. | Mechanical vibration - measurement of vibration generated internally in railway tunnels by the passage of trains 机械振动列车通过时引起铁路隧道内部振动的测量 |
| 8. | The coupled vibration between bridge and vehicle would be pronounced when high - speed vehicles pass through bridge 摘要高速列车通过桥梁时将会产生列车与桥梁相互耦合的振动。 |
| 9. | The result shows that the train passing capacity is closely linked with the train meeting place relative to the tunnel and that the train passing capacity decreases as the tunnel lengths and slops increase 对计算结果的分析表明,隧道的列车通过能力与列车的交会地点息息相关,而且随着隧道长度和坡度的增大逐渐变小。 |
| 10. | Because of the original design standard was low , the horizontal angur rigidity is serious lack , when the high speed train passes , the exceed limit of the horizontal swing had affected the lifting of the main trunk line , these diseases had been existed earlier but had not been gotten to resolve radical , and along with the increasing in speed of railroad train , these diseases performance will be more seriously , it ' s time for resolve 同时提速列车对桥梁结构的动力作用增大,特别是对上承式钢板梁。由于原设计标准低,横向刚度严重不足,高速列车通过时横向摆动严重超限等已严重影响了主要干线的提速,这些病害很早就存在但没有得到根治,随着列车提速,这些病害表现越来越严重,已到了必须整治的时候了。 |