| 1. | Question 9 : can columns be erected between the main line and arrival and departure line 铁路正线与到发线之间能否立柱? |
| 2. | Organization of train flow during speed - increasing reconstruction on busy main railway line 口泉一场万吨列车到发线改建的实施 |
| 3. | Scheduling model and algorithm of using up - and - down lines on railway marshalling station 铁路编组站到发线运用的排序模型和算法 |
| 4. | Rational number of arrival and departure tracks in passing stations along single - track railway 单线铁路会让站到发线数量的研究 |
| 5. | Calculated methods of carrying capacity for receiving and dispatching tracks at railway marshalling station 3 - stage 3 - yard 铁路编组站到发线通过能力计算方法 |
| 6. | 4 . application of routes of department and arrival , arrangement of cars " extraction and delivery and settling transfer locomotive are the key points 到发线的运用、取送车安排、调机作业安排是编制阶段计划、调车计划所要解决的关键问题。 |
| 7. | Answer 9 : structural columns can be built between main lien and arrival and departure line , but not between main lines . the column shall meet the requirement of track spacing 答:铁路正线与与正线之间不可以设结构柱。铁路正线与到发线之间可以设结构柱,但要满足线间距的要求。 |
| 8. | In this model , the control policy and precedence factors of objectives can be adjusted on the basis of the actual demands of passenger train operation to realize optimization of the departure time domain 在考虑客运站到发线能力,以及旅客列车必须在合理的时间域发车等约束条件下,建立旅客列车发车时间域的目标规划模型。 |
| 9. | A high - quality operative plan should focus on the important tasks , organize car flow into all kind of trains according to the demands of the marshalling plan , ensure that all departure trains leave station on time , schedule exactly the decomposing and marshalling of all trains and suitably arrange all trains to occupy the arrival and departure lines 一个好的阶段计划应该反映出本阶段的工作重点,并按照列车编组计划的要求,把车流及时编成各种列车,保证本阶段的所有出发列车都能正点发车,并能合理地安排列车解编顺序以及利用到发线接发列车。 |