Mobile
Log In Sign Up
Home > chinese-english > "前期工程" in English

English translation for "前期工程"

advance works

Related Translations:
绝经前期:  perimenopausal periodpremenopause
红细胞前期:  pre-erythrocytic stage
前期旋回:  preceding cycle
前期报废:  prior period retirement
癌症前期:  precancer
合成前期:  presynthesis phase
美前期:  antebellum
老年前期:  presenium
前期抑制剂:  prophase inhibitorprophase poison
糖尿病前期:  igt-ifgpre-diabetes
Example Sentences:
1.Briefing on the pre - project tendering of sixia yuan
浅议西霞院前期工程招投标工作
2.Management of project construction claims in early stage of hydropower station
水电站前期工程施工索赔管理
3.Roads works , use and compensation ordinance chapter 370 notice under section 8 - pwp item no . 5793th road p1 advance works at sunny bay , lantau
道路(工程、使用及补偿)条例(第370章) (根据第8 ( 2 )条规定所发的公告) - -工务计划项目第5793th号大屿山p1号道路欣澳段的前期工程
4.Since the high court rendered its judgement , the government has resumed only certain advance reclamation works , such as dredging and back - filling with rocks , and these on a restricted scale
因此,自高等法院作出判决以来,政府只是有限度恢复挖取淤泥和填回石料这些前期工程
5.Roads ( works , use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no . 5793th road p1 advance works at sunny bay , lantau
道路(工程、使用及补偿)条例(第370章) (根据第8 ( 2 )条规定所发的公告) - -工务计划项目第5793th号大屿山p1号道路欣澳段的前期工程
6.Whether it will set a timetable for the work of the plan such as public consultation , advance works , preparation of contract documents and award of contracts , etc ; if it will , of the details
会不会就有关计划的公?谘询、前期工程、准备合约文件及批出合约等工作制订时间表;若会,详情是甚么?
7.As the mac services provider , honeywell can apply its integrated strategy to each design phase , including front - end engineering development , early operator training and process simulation , advanced control modeling , process validation and advanced process control
作为主自动化承包商服务供应商,霍尼韦尔可以在每个设计阶段应用其整合策略,包括前期工程的开发、早期操作员的培训和流程模拟、高级控制模型、工艺验证和高级过程控制。
8.During the construction of the prophase works of dalong water control project , the supervisor can hold the construction progress and optimize various basic factors of the construction with quantitative management on all the contractors concerned in accordance with the requirement of the construction schedule before flood season ; with which the control objectives required by the owner are realized with the top construction quality rate over 90 %
摘要在大隆水利枢纽前期工程施工中,监理部能把握汛前工程进度要求的主线,优化各生产要素,对多个承包商实行量化管理,实现了业主要求的控制目标,使完工项目质量评定优良率超过90 % 。
Similar Words:
"前期分析" English translation, "前期服务成本" English translation, "前期复制" English translation, "前期肝硬变" English translation, "前期肝硬化" English translation, "前期工程设计" English translation, "前期工作" English translation, "前期公平" English translation, "前期股利" English translation, "前期固结压力" English translation