Mobile
Log In Sign Up
Home > chinese-english > "勘测设计院" in English

English translation for "勘测设计院"

surveying and designing institute

Related Translations:
勘察设计院:  prospecting and designing institute
勘测:  survey; reconnaissance 短语和例子地质勘测 geological survey; 地形勘测 topographical survey; 勘测报告 survey report; 勘测队 survey party; 勘测图 exploration map; 勘测者 cruiser
坝址勘测:  site survey
现场勘测:  site survey
勘测航线:  reconnaissance strip
水文勘测:  water survey
阵地勘测:  site survey
地质勘测:  geologic examinationgeological examinationgeological explorationgeological research
勘测报告:  reconnaissance reportsurvey report
勘测程序:  surveyor
Example Sentences:
1.In may 1999 the institute acquired quality system assurance certificate of iso9001 and overseas business qualification was ratified by the ministry of foreign economy and trade in march 2000
此后, 40余年间,因机构改革的需要,院名多有更变。 1958年称“河北省水利电力勘测设计院” 。
2.According to the general layout of survey bureau of the ministry of transportation , up to 70 ten - thousand - level ports can be built here with throughput of 100 million tons and 10 10 - 15 tons deep - water berths
根据交通部勘测设计院的总体布局规划,该港最终可建成70座万吨级码头,年吞吐量在1亿吨以上,可建数十座10 15万吨级的深水泊位。
3.The test on horizontal bearing capacity of thin - wall hollow pile is analyzed in the paper , which has been carried by shanghai investigation and design institute . the calculation results conform to the testing results . so , the analysis methods presented in the paper are validated by the results from field test
文中对上海勘测设计院进行的薄壁筒桩水平承载能力试验进行了相应的计算分析,所得结果规律与试验结果较为吻合,使得本文提出的分析方法得到了现场试验的验证。
4.Then the sponsor will invite a national each city subway construction conductor department , subway a programming a section , railroad construction , medium the iron tunnel survey design hospital , the railroad department first to investigate design hospital , medium the iron electrification survey design institute for research , the railroad department second to investigate design hospital , medium iron one bureau group etc . subway engineering in xian contract for a business enterprise to meeting visit to talk over
届时主办单位将邀请全国各省市地铁建设指挥部、地铁规划部门、铁路建设、中铁隧道勘测设计院、铁道部第一勘察设计院、中铁电气化勘测设计研究院、铁道部第二勘察设计院、中铁一局集团等西安地铁工程承包企业到会参观洽谈。
5.The design realm in the province of jilin , use more software is the bridge doctor system , bridge master , system of asbest , procedure of qjx and province highway of jilins survey to design the hospital to by oneself develop of the t beam plank beam painting procedure , the cover beam calculation painting procedure , a pillar calculation procedure , the upper part procedure compute a procedure mostly , even some procedures can paint , but the province painting of basic and dissatisfied foot jilin of born diagram paper style , the diagram paper the modification quantity compare greatly , the procedure that the lower part procedure adopts to by oneself
在吉林省内设计领域,使用较多的软件是桥梁博士系统、桥梁大师、 asbest系统、 qjx程序及吉林省公路勘测设计院自行研发的t梁板梁绘图程序,盖梁计算绘图程序,桩柱计算程序,上部程序多是计算型程序,即使有些程序能够绘图,但生成图纸基本不满足吉林省绘图风格,图纸修改量较大,下部程序多采用自行编制的程序,但大多数程序是dos系统的程序,使用不方便,同时与现行规范多有不符。
6.Which is situated in the western of he nan and is drought year in year out and it is a multiple - purpose water supply development with agricultural irrigation , municipal water supply and rural water of men and domestic animals . the irrigation district was designed by he nan water survey designing institute in 1967 , and began to be built in 1970 . the aggregate main canal and the east - two main canal were built up and began to irrigate partially in 1974 . up of the dong song part of the main canal had been built in 1980 , and the first periodical project was completed in 1991 . one part of the west main canal was built afterward
河南省陆浑灌区是河南省百万亩以上大型灌区之一,地处十年九旱的河南省西部,是一集农业灌溉,城市供水,农村人蓄吃水为一体的多目标供水工程,灌区于1967年由河南省水利勘测设计院开始勘测规划设计, 1970年开工建设, 1974年建成总干渠、东二干渠,并通水局部施灌, 1980年完成东一干渠东宋以上渠段, 1991年第一期工程竣工验收,以后又修建了西干渠部分工程。
7.Refractory companies rely on the abundant local resources , make full use of our advanced production facilities , with the institute of refractories luoyang , wuhan university , metallurgy , henan electric power survey and design institute , anshan iron and steel institute , a number of other research institutions , and universities and colleges to establish technical cooperation
公司依靠当地丰富的耐火材料资源,充分利用我们先进的生产设施,经过与洛阳耐火材料研究院、武汉冶金大学、河南省电力勘测设计院、鞍山钢铁技术学院等多家科研机构、高等院校建立了技术合作关系。
8.Many bore holes in shuangwangcheng reservoir which lies in the sedimentary area are drilled and lots of terra drill data are collected . five typical sections , i . e . section i ? i , ii ? i , iii ? ii , iv ? v ' and v ? v are drawn . the vertical sedimentary sequence of this sedimentary area is divided cbmbining the granularity features of sediments
课题组与山东省水利勘测设计院合作,对湖区内的双王城水库进行了钻探研究,搜集了大量的地质钻孔资料,经沉积物岩性特征分析,绘制出双王城水库外围1km处围绕水库的5个典型剖面(即剖面? ’ 、 ? ’ 、 ? ’ 、一’和? ’ )的剖面图,结合沉积物粒度特征,划分出该沉积区的垂向沉积序列。
Similar Words:
"勘测日期" English translation, "勘测摄影" English translation, "勘测摄影机" English translation, "勘测设计" English translation, "勘测设计阶段测量" English translation, "勘测时用交会法标出设计路线" English translation, "勘测艇" English translation, "勘测图" English translation, "勘测卫星" English translation, "勘测选点" English translation