Mobile
Log In Sign Up
Home > chinese-english > "压水试验" in English

English translation for "压水试验"

injection test
pacher permeability test
packer test
pumping-in test
water pressure test
water test
water-pressure test
Example Sentences:
1.Specification for pump - in test
压水试验规程
2.Code of water pressure test in borehole for water resources and hydropower engineering
水利水电工程钻孔压水试验规程
3.Packer permeability test
压水试验
4.Comparison of results of conventional and high pressure water - pressure tests on the dam foundation rock masses of xiluodu hydroelectric station
溪洛渡水电站坝基岩体钻孔常规压水与高压压水试验成果比较
5.Based on a thorough investigation of the engineering geological condition for the reservoir region of the huizhou pumped storage power station , the in - situ trial pit water injection test , boring water injection test , and water pressure test were performed to study the permeability of rock and soil mass
摘要在对惠州抽水蓄能电站库区工程地质条件进行详细调查的基础上,采用现场试坑注水和钻孔注水、压水试验等方法了解岩土体的透水性。
6.Then , the basic seepage theory and seepage characteristics are analyzed carefully in this paper . ( 2 ) the author researches the theory about field borehole test and result analysis , and gets quick , accurate and simple theory , method and technology with which the engineers can inspect the construction quality of rcc dams and feed back the construction
( 2 )开展了碾压混凝土坝现场压水试验方法与成果整理理论的研究,探索在碾压混凝土坝施工现场如何快速、准确、简便地进行施工质量检查的理论、方法和具体技术,实现对大坝混凝土的施工质量进行现场快速监测与检测以及因此而能够动态有效地进行反馈施工。
7.Ignore and construct issue of quality testing the reasons in many aspects have : on one hand , engineering construction square quality - mind thin , paying special attention to progress , take benefit simply ; on the other hand , the traditional detection method taking pressing water as main means , because its is time - consuming , strenuous , influences the construction speed , high characteristic of fabrication cost , make the unit in charge of construction and owner all unwilling to carry on the quality testing work
忽视施工质量检测的问题存在多方面的原因:一方面,工程建设方质量意识淡薄,一味的抓进度、要效益;另一方面,以压水试验为主要手段的传统检测方法,因其费时、费力、影响施工进度、造价高等特点,使施工单位和业主都不愿意进行质量检测工作。
Similar Words:
"压水渗透试验" English translation, "压水石墨反应堆" English translation, "压水式反应堆" English translation, "压水式反应堆;压水堆" English translation, "压水式反应器" English translation, "压水试验;压水渗透试验" English translation, "压水试验孔" English translation, "压水型堆" English translation, "压水型反应堆" English translation, "压水运行方式" English translation