| 1. | Pump out port no . 1 ballast water overboard 将左舷第1舱压载水排出船外。 |
| 2. | Put the preload water into the tank 向压载舱灌压压载水 |
| 3. | Research on the treatment to the biological invasions from ballast water 船舶压载水外来生物入侵传播的防治 |
| 4. | We need 5500 tons of preload water 需要5500吨压载水 |
| 5. | Transf . 100t of ballast water from port no . 1 to stbd no . 2 double bottom 将左舷1号舱的100t压载水驳到右舷2号双层舱。 |
| 6. | Segregated ballast tank 分隔压载水舱 |
| 7. | Variable - ballast water 可变压载水 |
| 8. | As rust converter / anticorrosive in ballast tanks , bilges , cofferdams etc 因其锈蚀转化/抑制作用,适用于压载水仓、底仓、围堰等。 |
| 9. | Bwt ballast water tank 压载水舱 |
| 10. | Two components modified aluminium pigmented epoxy for use as a first coat in ballast tanks 双组分改性环氧铝粉漆,用于压载水舱。 |