English translation for "吊箱"
|
- overhead bin
skip strap-on tank
Related Translations:
- Example Sentences:
| 1. | The design and construction of boxed cofferdam of the zhujiang bridge 珠江特大桥吊箱围堰设计与施工 | | 2. | Steel wall cofferdam construction of the no . 3 main tower pier for tianxingzhou yangtze river bridge 天兴洲长江大桥3号主塔墩钢吊箱围堰施工 | | 3. | The construction method using steel boxed cofferdam is a chief method for construction of pile caps in deep water 摘要钢吊箱围堰施工方法是深水承台施工中的一种主要施工方法。 | | 4. | Design and construction of steel boxed cofferdams for pile caps of hangzhou bay sea - crossing bridge in tidal - flat area on south bank 杭州湾跨海大桥南滩涂区承台钢吊箱围堰设计与施工 | | 5. | With the development of construction technology and mechanic about deepwater foundation , hanging box weir had being applied widely for construction of high pile cap 随着深水基础施工技术和机械的发展,吊箱围堰在高桩承台施工中的应用日益广泛。 | | 6. | Acting as the major component for construction of pile caps in deep water , the rational design of the cofferdam has a direct bearing to the construction quality of whole bridge 钢吊箱作为深水承台施工的主要构件,其设计的合理与否关系到整个桥梁的施工质量。 | | 7. | The construction practice indicates that the design of the cofferdam for the bridge is rational , can meet the construction requirements and is of certain reference to the construction of similar elevated pile caps 工程实践表明,该钢吊箱设计合理,能满足工程的需要,对同类承台施工有一定的借鉴意义。 | | 8. | In this thesis , on the basis of the existing construction and design data in the world , as an example of daliao river bridge , which is the second deepwarter bridge above daliao river , the auther makes a review and summary of hanging box construction method , introduces design and construction process of the hanging box of daliao river bridge in detail 本论文以辽河上的第二座深水特大桥? ?大辽河特大桥为背景,在搜集国内外已有的深水基础施工及设计资料的基础上,对吊箱法施工高桩承台工法进行了归纳和总结;对大辽河特大桥高桩承台吊箱的施工设计与施工过程作了较为详细的介绍。 | | 9. | If there is no over burden at the river bed , the steel pipe pile cannot be inserted , the floating platform will be adopted , during overwater construction , the author ( using zhong - 60 floating box , etc . ) assembled 40t floating crane by his own design , in this way , the floating crane completed the work of overwater transporting and lifting , such as the transporting of s teel pipe pile , inserting , the erecting of overwater construction platform , overwater moving of drill grid crane , lifting of lifting box of cushion cap , pulling out of steel pipe pile 在水上作业中,作者利用中- 60浮箱等设备自行设计、拼制了40t浮吊,完成了水上运输、水上起重等作业,如钢管桩的运输、插打、水上施工平台的搭设、钻机吊车的水上转移、承台吊箱的起吊、钢管桩的拔除等作业。 | | 10. | In this paper , by way of example of the elevated pile cap construction of sanmenjiang bridge in liuzhou city , the design and construction of the column steel boxed cofferdam of tensile and compressive type are introduced with particular details given to its design scheme , working principles , construction technology and construction key points , and the matters of attention in the construction with the cofferdam are expatiated as well 以柳州市三门江大桥高桩承台施工为例,介绍拉压柱式钢吊箱围堰的设计与施工,重点介绍钢吊箱围堰的设计方案、工作原理、施工工艺及施工要点等技术细节,同时对钢吊箱围堰施工中的注意事项进行了阐述。 |
- Similar Words:
- "吊线挺针片" English translation, "吊线袜子" English translation, "吊线圆型针织机" English translation, "吊线装置" English translation, "吊线坠" English translation, "吊箱费" English translation, "吊箱钩" English translation, "吊箱井" English translation, "吊箱系统" English translation, "吊销" English translation
|
|
|