Mobile
Log In Sign Up
Home > chinese-english > "坝坡" in English

English translation for "坝坡"

dam slope

Related Translations:
道格拉斯坝:  douglas dam
水田坝:  shuitianba
崩坍坝:  avalanche dam
灰坝:  ash dam
坝肩:  rock dam abutment
尼龙坝:  fabridamnylon dam
鼓坝:  dmm weir dam
中坝:  zhongba
党坝:  dangba
护坝:  check dam
Example Sentences:
1.Application of plastics membrance at the dam slope to antifreezing heaving damages
塑料薄膜在坝坡防冻胀破坏中的应用
2.Stability analysis indicates that the safety factor of the dam is suitable and sufficient for a seismic design
稳定计算的结果也表明,坝坡的安全系数是足够的,满足抗震要求。
3.Top soil masses of dam slope soak and produce wetting more easily than low soil of slope in spite of rainfall intensity
不管降雨强度如何,坝顶和坝坡中上部比坡体的中下部更容易受降雨浸湿。
4.The effects of the stratification of rockfill on the seepage field and the stability of the dam slope were highlighted
指出填料严重分层后对坝体渗流场的影响以及对坝坡渗透稳定性的不利影响。
5.In the light of the study result that the energy dissipation ratio is higher as the spillway slope is gentle , to applied stepped spillway to overflow earth - rock dams with a certain height is proposed
根据坝坡较缓时,阶梯的消能率较高的研究成果,提出把阶梯溢流应用于一定高度过水土石坝。
6.The result shows soil masses in surface layer reach saturation more easily under great rainfall intensity and long - lasting rainfall , at the same time , there are big infiltration depth and influence of wetting deformation
结果显示,降雨强度越大、降雨持续时间越长,非饱和区土体含水率变化也大,坝坡表层土体较容易达到饱和,并且降雨影响深度也大,对坝坡表面湿化裂隙的产生及坝坡稳定性影响大。
7.( 2 ) carry out a comprehensive research on their technological characteristics and suitabi 1 ity in dealing wi th the xiacouba reservoir project , the details are as follows : cd in connection with grievous seepage problem and slope stability problem of the foundation overburden and the dam itself , there are two positive plans for dealing the seepage and three for upstream slope stabi 1 ity
具体内容如下:针对下口坝水库坝体、坝基覆盖层渗漏严重,上游坝坡稳定性差,多次滑坡特点,大坝防渗处理拟定了二种处理方案,上游坝坡加固拟定了三种处理方案,从技术可靠、工期短、造价省、施工条件等方面进行评价。
8.Utilizing pseudo - static method theory , calculated the safety factor for the dam slope , give , a primary conclusion . . utilizing static finite element method based on duncan - chang hyperhola modelfound the static stress riele , make the foundation for hynamical finite element analysis . utilizing dynamical finite element method based on equipollence linearity model , found the dynamical stress field and the acceleration field , make the foundation for calculated the safety factor of the dam slop with finite element method
运用拟静力法的基本原理,对满拉堆石坝的坝坡稳定进行了分析研究,得出了初步结论;采用duncan - chang双曲线模型,用计算土石坝应力及变形的静力有限元程序,对满拉堆石坝进行了静力有限元分析,得到了坝体的静应力场分布,为动力有限元计算打下基础。
9.Taken the bank spillway at yubeishan reservoir as an example , the water loads acted on the spillway , such as static water pressure , dynamic water pressure , shear stress on the surface of the step and so on , are calculated , which can provide evidence to the stability analysis of the dam slope and slope protection
并以万县鱼背山水库岸边溢洪道为例,计算了溢洪道上所受的水流荷载及其分布,为土石坝坡和护面的稳定分析提供了依据。通过计算证实了既使在较大的单宽流量下,缓坡上的阶梯仍有较高的消能率。
10.The technique of splitting grouting is a method for handling the earth dam " s stability with deformation and permeation . it is developed quickly in several decades . the author , regarding left subsidiary dam of shenzhen reservoir as an example , uses the limited element method to proceed the dam ' s seepage calculation , combines the contrast analysis with prototype data and predicted data , then compares the dam ' s seepage behavior " s changes before splitting grouting with that after splitting grouting , has some basic conclusions
土坝坝体劈裂灌浆技术是近几十年来发展迅速的一种处理土坝坝体变形稳定和渗透稳定问题的方法,本文以深圳水库左副坝为具体实例,利用有限单元法进行了坝体渗流计算,并与原型观测资料进行对比分析,然后比较了劈裂灌浆前后坝体渗流状况的改变,并对坝坡稳定进行分析,得出了一些基本结论,对利用有限单元法求解劈裂灌浆前后坝体的渗流问题提出了一些建议。
Similar Words:
"坝内廊道" English translation, "坝内廊道系统" English translation, "坝内式厂房" English translation, "坝内式水电站厂房" English translation, "坝内竖井" English translation, "坝漆" English translation, "坝前渗流" English translation, "坝墙" English translation, "坝墙管子" English translation, "坝区平面图" English translation