| 1. | Workable when the temperature is over 20 适用于要求降低水化热的大体积混凝土。 |
| 2. | Crack control technique of mass concrete construction 大体积混凝土施工裂缝控制方法 |
| 3. | Big physical volume concrete temperature control that protect 大体积混凝土养护的温度控制 |
| 4. | Discussion about construction technology of the huge volume concrete 大体积混凝土施工技术探讨 |
| 5. | 5 measure of preventing mass concrete absorb energy of sun 5防止大体积混凝土热量倒灌的具体措施。 |
| 6. | Prevention amp; treatment of quality common fault in large volume concrete 大体积混凝土质量通病的防治 |
| 7. | Computational method of cooling pipe in massive concrete of arch dam 拱坝大体积混凝土冷却水管计算方法 |
| 8. | Study on cold wave - induced temperature stresses of mass concrete 气温骤降时大体积混凝土的温度应力计算 |
| 9. | Construction technology in winter for a big volume of concrete foundation 大体积混凝土基础冬季施工技术 |
| 10. | Experience and appliance of big volume concrete mixing with slag powder 大体积混凝土掺矿粉的试验与应用 |