| 1. | Analyses of the repertory scale for food security in china 中国粮食安全储备及其规模确定 |
| 2. | Order & manage spare parts with necessary safety stock 订购及管理备件,控制备件的安全储备。 |
| 3. | The experimentative load - carrying capacity attest that safety store is small , so it should strengthen structure capacity 试验承载力验证了《高层规程》提供的公式安全储备较小,宜进行加强。 |
| 4. | In comparison with the design value , the actual force and deformation are less than design value , the bridge is safe 与桥梁设计值相比较,各测点实际受力测量值小于计算值。该桥梁的实际受力和变形均小于设计值,具有一定的安全储备。 |
| 5. | Therefore , the deterministic safety coefficient ca n ' t be used to offer the measure of liable preservation in actual slide and the potential probability of failure 因此,用确定性的安全系数无法提供滑坡体实际可能具备的安全储备的量以及潜在的失效概率。 |
| 6. | Abstract : the various changes of dry - shrink and temperature are f airly sensitive to the shape of a cast - in - site concrete roof and leveling blanket 文摘:屋盖与找平层对于混凝土干缩和温度的变化比较敏感,其原因是由于设计安全储备小,强度不足及施工质量差。 |
| 7. | The calculation result shows that the structural reliability comes to the target reliability index and contains definite safety stores . therefore , the structure is safe and dependable 计算结果表明,结构可靠度达到了目标可靠指标的要求,并有一定的安全储备,结构是安全可靠的。 |
| 8. | In order to guarantee high - speed train running safe and stably , the safety reserve must be enough for the stability of high - speed railway over - section continuously welded rail ( cwr ) track 为了保证高速列车安全、平稳地运行,高速铁路跨区间无缝线路的稳定性必须有足够的安全储备。 |
| 9. | Calculation results of an arch dam show that the stress - oriented shape optimization design method can rationally adjust the stress state of the dam so as to reach a higher safety factor 以该模型计算某高拱坝的结果表明,以应力为目标的拱坝体型优化设计,可合理地调整坝体应力状态,从而获得更高的安全储备。 |
| 10. | Integral stability capacity of rolled beam is more 10 % ~ 20 % than welded beam . at the same time , the inelastic integral stability capacity of wild rolled h - section ( hw ) steel beam is more superior observably than hn steel beam 弹塑性稳定范围,轧制梁比焊接梁大约多10 20的安全储备,且宽翼缘轧制h型钢的整体稳定性能高于窄翼缘轧制h型钢。 |