| 1. | Recommendations for tapping drill sizes for use with fluted taps 带槽丝锥用螺纹底孔钻头尺寸推荐标准 |
| 2. | Analysis and prediction on diversion ratio of bottom diversion outlet of tgp dam 导流底孔分流比的分析和预报 |
| 3. | Influence of steady temperature field to bottom orifice stress of baishi reservoir 稳定温度场对白石水库底孔应力的影响 |
| 4. | Flat - bottomed hole equivalent 平底孔当量 |
| 5. | Dispositions and structures design of bottom sluice conduits of the guanyinge reservoir 观音阁水库底孔泄洪布置和结构设计 |
| 6. | Anti abrasion and anti cavitation mensures for the bottom of flood way of fenhe no . 2 reservoir dam 汾河二库大坝泄洪底孔抗磨及防气蚀措施 |
| 7. | Application of acrylamide sand grout to treatment of bottom concrete defect in baishi reservoir 丙乳砂浆在白石水库底孔混凝土缺陷处理中的应用 |
| 8. | Abrasion resistance and cavitation preventive of bottom flood - discharge outlet of fenghe second reservoir dam 汾河二库大坝泄洪底孔抗磨及防气蚀措施 |
| 9. | Briefing on design work of danjiangkou dam heightening - the water source project of south to north water transfer plan 三峡大坝导流底孔封堵温度应力仿真计算分析 |
| 10. | Bottom hole layout of flood discharing and sediment flushing and application of silicon powder concrete in baishi reservoir 白石水库泄洪排沙底孔布置及硅粉混凝土应用 |